X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404072009032

Well Details

Well ID: 0404072009032
Loading map...
Location: 03/09-20-040-07W4/2
Location Alias: 03/09-20-40-07 W4M
Location Alias 2: 03/09-20-040-07 W4/02
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 07
Section: 20
County/Municipality: Municipal District of Provost No. 52
Well Name: SOC PROVOST 9-20-40-7
Operator Name: AlphaBow Energy Ltd.
License Number: 0156747
License Date: 1993-02-24
License Status: Issued
Spud Date: 1993-03-17
Final Drill Date: 1993-03-20
Well Total Depth: 953.00 m
Surface Hole Latitude: 52.458000
Surface Hole Longitude: -110.966393

For data sources see[1][2]

Well History

Date Event
1993-02-24 Obtained License
1993-03-18 Direction Drilling Operation Performed - Deviate
1993-03-18 Surface Casing Operation Performed
1993-03-20 Finished Drilling
1993-03-20 Production Casing Operation Performed
1993-03-20 Well Log Performed
1993-03-20 Well Mode changed to Drilled and Cased
1993-03-21 Rig Released
1993-04-07 Well Log Performed
1993-05-03 Perforation Treatment Performed - Jet Perforation
2006-07-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-07-25 Perforation Treatment Performed - Jet Perforation
2006-07-25 Plug Back Performed
2006-07-25 Well Log Performed
2006-07-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-07-28 Perforation Treatment Performed - Jet Perforation
2006-07-28 Plug Back Performed
2006-07-28 Well Log Performed
2006-07-28 Well Mode changed to Abandoned Zone

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1993-03-18 217.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1993-05-03 Perforation 882.00 884.00 13
2006-07-25 Packing Device Capped w/Cement 866.00 874.00 0
2006-07-25 Perforation 824.00 827.00 17
2006-07-25 Perforation 821.50 822.50 17
2006-07-28 Packing Device Capped w/Cement 807.00 815.00 0
2006-07-28 Perforation 780.00 781.00 17
2006-07-28 Perforation 777.00 779.00 17

For data sources see[5]



References