X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404072107002

Well Details

Well ID: 0404072107002
Loading map...
Location: 00/07-21-040-07W4/2
Location Alias: 00/07-21-40-07 W4M
Location Alias 2: 00/07-21-040-07 W4/02
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 07
Section: 21
County/Municipality: Municipal District of Provost No. 52
Well Name: SOC PROVOST 7-21-40-7
Operator Name: AlphaBow Energy Ltd.
License Number: 0013342
License Date: 1957-05-10
License Status: Abandoned
Spud Date: 1957-05-09
Final Drill Date: 1957-05-13
Well Total Depth: 882.40 m
Surface Hole Latitude: 52.453925
Surface Hole Longitude: -110.950104

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1957-05-10 Obtained License
1957-05-13 Drill Stem Test Performed
1957-05-13 Finished Drilling
1957-05-13 Production Casing Operation Performed
1957-05-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1957-05-15 Perforation Treatment Performed - Jet Perforation
1957-05-16 Perforation Treatment Performed - Cement Squeeze
1957-05-17 Perforation Treatment Performed - Jet Perforation
1957-05-30 Perforation Treatment Performed - Cement Squeeze
1957-06-01 Perforation Treatment Performed - Bullet Perforation
1962-11-15 Perforation Treatment Performed - Cement Squeeze
1962-11-15 Perforation Treatment Performed - Jet Perforation
1986-10-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1986-10-20 Plug Back Performed
1986-10-21 Perforation Treatment Performed - Jet Perforation
1986-10-24 Perforation Treatment Performed - Jet Perforation
1986-10-25 Well Mode changed to Drilled and Cased
1988-05-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1988-05-17 Plug Back Performed
1988-05-17 Well Mode changed to Abandoned
1988-05-19 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1957-05-15 Perforation 831.50 831.80 26
1986-10-21 Perforation 810.00 812.00 13
1986-10-24 Perforation 810.00 812.00 13
1988-05-17 Packing Device Capped w/Cement 797.00 805.00 0
1957-05-15 Acid Treatment 831.50 831.80 0
1957-05-16 Cement Squeeze 831.50 831.80 0
1957-05-17 Perforation 820.80 823.90 13
1957-05-30 Cement Squeeze 820.80 823.90 0
1957-06-01 Bullet Perforation 821.70 823.90 0
1962-11-15 Perforation 823.00 826.00 13
1962-11-15 Cement Squeeze 823.00 826.00 0
1986-10-20 Packing Device Capped w/Cement 813.00 819.00 0

For data sources see[4]



References