If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0404090107030 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.411015,"lon":-111.157425,"icon":""}]} |
Location: 03/07-01-040-09W4/0 | |
Location Alias: 03/07-01-40-09 W4M | |
Location Alias 2: 03/07-01-040-09 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 040 | |
Meridian: 4 | |
Range: 09 | |
Section: 01 | |
County/Municipality: Municipal District of Provost No. 52 | |
Well Name: 1994450AB PROVOST 7-1-40-9 | |
Operator Name: Rockeast Energy Corp. | |
License Number: 0435446 | |
License Date: 2011-07-25 | |
License Status: Issued | |
Spud Date: 2011-10-21 | |
Final Drill Date: 2011-10-27 | |
Well Total Depth: 1446.00 m | |
Surface Hole Latitude: 52.411015 | |
Surface Hole Longitude: -111.157425 |
Date | Event |
---|---|
2011-07-25 | Obtained License |
2011-10-22 | Surface Casing Operation Performed |
2011-10-23 | Direction Drilling Operation Performed - Deviate |
2011-10-23 | Well Log Performed |
2011-10-24 | Direction Drilling Operation Performed - Horizontal |
2011-10-25 | Intermediate Casing Operation Performed |
2011-10-27 | Finished Drilling |
2011-10-27 | Well Log Performed |
2011-10-27 | Well Mode changed to Drilled and Cased |
2011-10-28 | Liner Casing Operation Performed |
2011-10-28 | Perforation Treatment Performed - Open-Hole Completion |
2011-10-28 | Perforation Treatment Performed - Slotted Liner or Casing |
2011-10-28 | Rig Released |
2011-11-08 | Well Log Performed |
2011-12-21 | Well Began Production |
2011-12-21 | Well Fluid changed to Crude Oil |
2011-12-21 | Well Mode changed to Pumping |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-10-23 | 673.90 | Deviate (5 - 79 degrees) |
2011-10-24 | 1009.80 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-10-28 | Slotted Liner | 1038.00 | 1432.20 | 0 |
2011-10-28 | Open Hole/Barefoot Completion | 1432.20 | 1446.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 264 | 0.0 | 0.0 | 0.0 |
2012 | 8198 | 0.0 | 0.0 | 0.0 |
2013 | 8694 | 0.0 | 0.0 | 0.0 |
2014 | 8673 | 0.0 | 0.0 | 0.0 |
2015 | 8693 | 0.0 | 0.0 | 0.0 |
2016 | 8650 | 0.0 | 0.0 | 0.0 |
2017 | 8660 | 0.0 | 0.0 | 0.0 |
2018 | 7929 | 0.0 | 0.0 | 0.0 |
2019 | 7475 | 0.0 | 0.0 | 0.0 |
2020 | 2181 | 0.0 | 0.0 | 0.0 |
For data sources see[6]