X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404090116030

Well Details

Well ID: 0404090116030
Loading map...
Location: 03/16-01-040-09W4/0
Location Alias: 03/16-01-40-09 W4M
Location Alias 2: 03/16-01-040-09 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 09
Section: 01
County/Municipality: Municipal District of Provost No. 52
Well Name: 1994450AB PROVOST 16-1-40-9
Operator Name: Rockeast Energy Corp.
License Number: 0394229
License Date: 2008-02-15
License Status: Amended
Spud Date: 2008-06-01
Final Drill Date: 2008-06-07
Well Total Depth: 1455.00 m
Surface Hole Latitude: 52.412685
Surface Hole Longitude: -111.164586

For data sources see[1][2]

Well History

Date Event
2008-02-15 Obtained License
2008-06-02 Surface Casing Operation Performed
2008-06-04 Direction Drilling Operation Performed - Deviate
2008-06-05 Direction Drilling Operation Performed - Horizontal
2008-06-06 Intermediate Casing Operation Performed
2008-06-07 Finished Drilling
2008-06-07 Well Log Performed
2008-06-07 Well Mode changed to Drilled and Cased
2008-06-08 Liner Casing Operation Performed
2008-06-08 Perforation Treatment Performed - Open-Hole Completion
2008-06-08 Perforation Treatment Performed - Slotted Liner or Casing
2008-06-08 Rig Released
2008-07-15 Well Log Performed
2008-09-19 Well Began Production
2008-09-19 Well Fluid changed to Crude Oil
2008-09-19 Well Mode changed to Pumping
2013-05-29 Perforation Treatment Performed - Jet Perforation
2013-05-30 Perforation Treatment Performed - Jet Perforation

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2008-06-04 675.10 Deviate (5 - 79 degrees)
2008-06-05 1018.60 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2008-06-08 Slotted Liner 1162.80 1451.00 0
2008-06-08 Open Hole/Barefoot Completion 1451.00 1455.00 0
2013-05-29 Perforation 1423.00 1450.00 17
2013-05-30 Perforation 1310.00 1379.00 17

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2008 2020 0.0 0.0 0.0
2009 6442 0.0 0.0 0.0
2011 5465 0.0 0.0 0.0
2012 8581 0.0 0.0 0.0
2013 5569 0.0 0.0 0.0
2014 8615 0.0 0.0 0.0
2015 8742 0.0 0.0 0.0
2016 8711 0.0 0.0 0.0
2017 8666 0.0 0.0 0.0
2018 8683 0.0 0.0 0.0
2019 8561 0.0 0.0 0.0
2020 2178 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2008-07-15 No Incident Encountered 0.00 0.00
2013-05-31 No Incident Encountered 0.00 0.00

For data sources see[7]

References