X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404101316020

Well Details

Well ID: 0404101316020
Loading map...
Location: 02/16-13-040-10W4/0
Location Alias: 02/16-13-40-10 W4M
Location Alias 2: 02/16-13-040-10 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 10
Section: 13
County/Municipality: County of Paintearth No. 18
Well Name: 1994450AB PROVOST 16-13-40-10
Operator Name: Rockeast Energy Corp.
License Number: 0128836
License Date: 1987-09-29
License Status: Suspension
Spud Date: 1987-10-02
Final Drill Date: 1987-10-04
Well Total Depth: 946.00 m
Surface Hole Latitude: 52.446809
Surface Hole Longitude: -111.304810

For data sources see[1][2]

Well History

Date Event
1987-09-29 Obtained License
1987-10-03 Surface Casing Operation Performed
1987-10-04 Finished Drilling
1987-10-04 Well Log Performed
1987-10-04 Well Mode changed to Drilled and Cased
1987-10-05 Drill Stem Test Performed
1987-10-05 Production Casing Operation Performed
1987-10-06 Rig Released
1987-10-21 Perforation Treatment Performed - Jet Perforation
1987-10-22 Perforation Treatment Performed - Jet Perforation
1987-10-23 Well Began Production
1987-10-23 Well Fluid changed to Crude Oil
1987-10-23 Well Mode changed to Flowing
1996-04-01 Well Fluid changed to Crude Oil
1996-04-01 Well Mode changed to Suspended
1996-06-05 Well Fluid changed to Crude Oil
1996-06-05 Well Mode changed to Pumping
1997-01-01 Well Fluid changed to Crude Oil
1997-01-01 Well Mode changed to Suspended
2001-04-07 Well Fluid changed to Crude Oil
2001-04-07 Well Mode changed to Pumping
2007-11-07 Well Log Performed
2017-05-12 Well Fluid changed to Crude Oil
2017-05-12 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1987-10-21 Perforation 863.50 865.00 13
1987-10-22 Perforation 863.50 865.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1987 1672 0.0 0.0 0.0
1988 8614 0.0 0.0 0.0
1989 6935 0.0 0.0 0.0
1990 848 0.0 0.0 0.0
1991 6814 0.0 0.0 0.0
1992 7392 0.0 0.0 0.0
1993 3936 0.0 0.0 0.0
1994 5006 0.0 0.0 0.0
1995 4632 0.0 0.0 0.0
1996 2904 0.0 0.0 0.0
2001 5472 0.0 0.0 0.0
2002 3936 0.0 0.0 0.0
2003 4944 0.0 0.0 0.0
2004 6599 0.0 0.0 0.0
2005 8712 0.0 0.0 0.0
2006 6431 0.0 0.0 0.0
2007 1074 0.0 0.0 0.0
2008 7007 0.0 0.0 0.0
2009 4890 0.0 0.0 0.0
2010 7776 0.0 0.0 0.0
2011 445 0.0 0.0 0.0
2012 5522 0.0 0.0 0.0
2013 8306 0.0 0.0 0.0
2014 7487 0.0 0.0 0.0
2015 8720 0.0 0.0 0.0
2016 939 0.0 0.0 0.0

For data sources see[5]

References