X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404120904A02

Well Details

Well ID: 0404120904A02
Loading map...
Location: A0/04-09-040-12W4/2
Location Alias: A0/04-09-40-12 W4M
Location Alias 2: A0/04-09-040-12 W4/02
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 12
Section: 09
County/Municipality: Flagstaff County
Well Name: 1994450AB PROVOST 4-9-40-12
Operator Name: AlphaBow Energy Ltd.
License Number: 0160716
License Date: 1993-08-30
License Status: Amended
Spud Date: 1993-12-16
Final Drill Date: 1993-12-19
Well Total Depth: 1047.00 m
Surface Hole Latitude: 52.422076
Surface Hole Longitude: -111.676699

For data sources see[1][2]

Well History

Date Event
1993-08-30 Obtained License
1993-12-17 Direction Drilling Operation Performed - Deviate
1993-12-19 Finished Drilling
1993-12-19 Production Casing Operation Performed
1993-12-19 Rig Released
1993-12-19 Well Log Performed
1993-12-19 Well Mode changed to Drilled and Cased
1993-12-30 Well Log Performed
1994-01-03 Perforation Treatment Performed - Jet Perforation
1994-01-03 Well Log Performed
1994-01-13 Well Began Production
1994-01-13 Well Fluid changed to Crude Oil
1994-01-13 Well Mode changed to Pumping
1996-04-20 Well Log Performed
1996-04-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-04-21 Perforation Treatment Performed - Jet Perforation
1996-04-21 Well Fluid changed to Crude Oil
1996-04-21 Well Mode changed to Suspended
1996-04-22 Perforation Treatment Performed - Fractured
1996-04-22 Well Fluid changed to Crude Oil
1996-04-22 Well Mode changed to Abandoned Zone
1996-09-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1996-09-22 Well Log Performed
2002-01-12 Perforation Treatment Performed - Jet Perforation
2002-01-14 Perforation Treatment Performed - Jet Perforation
2002-01-14 Well Log Performed
2005-11-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-11-21 Plug Back Performed
2008-01-05 Well Log Performed
2008-01-07 Perforation Treatment Performed - Jet Perforation
2008-01-22 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1993-12-17 279.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-01-03 Perforation 1015.50 1016.00 13
2008-01-07 Perforation 1015.50 1016.00 13
2008-01-07 Perforation 1016.00 1031.00 20
1996-04-21 Packing Device Capped w/Cement 1012.00 1014.00 0
1996-04-21 Perforation 1006.00 1008.00 14
1996-04-22 Fracture 1006.00 1008.00 0
1996-09-22 Acid Treatment 1006.00 1008.00 0
2002-01-12 Perforation 1015.50 1016.00 13
2002-01-14 Perforation 1016.00 1031.00 20
2005-11-21 Packing Device Capped w/Cement 992.00 1000.00 0
2008-01-07 Perforation 1006.00 1008.00 14

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1994 6674 0.0 0.0 0.0
1995 2590 0.0 0.0 0.0

For data sources see[6]

References