X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404130715000

Well Details

Well ID: 0404130715000
Loading map...
Location: 00/15-07-040-13W4/0
Location Alias: 00/15-07-40-13 W4M
Location Alias 2: 00/15-07-040-13 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 13
Section: 07
County/Municipality: County of Paintearth No. 18
Well Name: KARVE PROVOST 15-7-40-13
Operator Name: Karve Energy Inc.
License Number: 0434079
License Date: 2011-06-06
License Status: Issued
Spud Date: 2011-09-18
Final Drill Date: 2011-09-24
Well Total Depth: 2216.00 m
Surface Hole Latitude: 52.421137
Surface Hole Longitude: -111.858438

For data sources see[1][2]

Well History

Date Event
2011-06-06 Obtained License
2011-09-18 Surface Casing Operation Performed
2011-09-19 Direction Drilling Operation Performed - Horizontal
2011-09-21 Intermediate Casing Operation Performed
2011-09-21 Well Log Performed
2011-09-24 Finished Drilling
2011-09-24 Well Log Performed
2011-09-24 Well Mode changed to Drilled and Cased
2011-09-25 Liner Casing Operation Performed
2011-09-26 Perforation Treatment Performed - Open-Hole Completion
2011-09-26 Rig Released
2011-09-27 Well Log Performed
2011-09-30 Perforation Treatment Performed - Multi-Stage Fracture
2011-10-19 Well Began Production
2011-10-19 Well Fluid changed to Crude Oil
2011-10-19 Well Mode changed to Flowing
2018-04-25 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-09-19 570.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-09-26 Open Hole/Barefoot Completion 2200.00 2216.00 0
2011-09-30 Multi-Stage Fracture 1623.00 1623.10 0
2011-09-30 Multi-Stage Fracture 1561.00 1561.10 0
2011-09-30 Multi-Stage Fracture 1487.00 1487.10 0
2011-09-30 Multi-Stage Fracture 1436.00 1436.10 0
2011-09-30 Multi-Stage Fracture 1363.00 1363.10 0
2011-09-30 Multi-Stage Fracture 1323.00 1323.10 0
2011-09-30 Multi-Stage Fracture 1142.00 1142.10 0
2011-09-30 Multi-Stage Fracture 1068.00 1068.10 0
2018-04-25 Acid Treatment 1068.00 2184.10 0
2011-09-30 Multi-Stage Fracture 2184.00 2184.10 0
2011-09-30 Multi-Stage Fracture 2144.00 2144.10 0
2011-09-30 Multi-Stage Fracture 1997.00 1997.10 0
2011-09-30 Multi-Stage Fracture 1934.00 1934.10 0
2011-09-30 Multi-Stage Fracture 1849.00 1849.10 0
2011-09-30 Multi-Stage Fracture 1798.00 1798.10 0
2011-09-30 Multi-Stage Fracture 1748.00 1748.20 0
2011-09-30 Multi-Stage Fracture 1686.00 1686.10 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 2060 0.0 0.0 0.0
2012 8649 0.0 0.0 0.0
2013 8662 0.0 0.0 0.0
2014 8170 0.0 0.0 0.0
2015 8530 0.0 0.0 0.0
2016 8651 0.0 0.0 0.0
2017 8387 0.0 0.0 0.0
2018 8654 0.0 0.0 0.0
2019 8437 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-04-25 No Incident Encountered 0.00 0.00

For data sources see[7]

References