X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404131108000

Well Details

Well ID: 0404131108000
Loading map...
Location: 00/08-11-040-13W4/0
Location Alias: 00/08-11-40-13 W4M
Location Alias 2: 00/08-11-040-13 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 13
Section: 11
County/Municipality: Flagstaff County
Well Name: PRED C-1 HALKIRKE 8-11-40-13
Operator Name: Pismo Energy Ltd.
License Number: 0123511
License Date: 1986-07-23
License Status: Suspension
Spud Date: 1986-07-28
Final Drill Date: 1986-07-30
Well Total Depth: 1025.00 m
Surface Hole Latitude: 52.426176
Surface Hole Longitude: -111.761969

For data sources see[1][2]

Well History

Date Event
1986-07-23 Obtained License
1986-07-29 Surface Casing Operation Performed
1986-07-30 Finished Drilling
1986-07-30 Well Log Performed
1986-07-30 Well Mode changed to Drilled and Cased
1986-07-31 Production Casing Operation Performed
1986-07-31 Rig Released
1986-07-31 Well Log Performed
1986-08-24 Well Log Performed
1986-10-05 Perforation Treatment Performed - Jet Perforation
1986-10-05 Well Log Performed
1986-11-05 Well Began Production
1986-11-05 Well Fluid changed to Crude Oil
1986-11-05 Well Mode changed to Pumping
1987-01-21 Perforation Treatment Performed - Cement Squeeze
1987-01-24 Perforation Treatment Performed - Jet Perforation
1987-01-24 Well Log Performed
1999-01-12 Well Fluid changed to Crude Oil
1999-01-12 Well Mode changed to Suspended
1999-01-13 Perforation Treatment Performed - Jet Perforation
1999-01-13 Well Fluid changed to Crude Oil
1999-01-13 Well Mode changed to Pumping
2000-01-08 Perforation Treatment Performed - Jet Perforation
2000-01-08 Well Log Performed
2012-12-01 Well Fluid changed to Crude Oil
2012-12-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1986-10-05 Perforation 992.50 994.00 14
1987-01-21 Cement Squeeze 992.50 994.00 0
1987-01-24 Perforation 997.20 998.00 13
1999-01-13 Perforation 974.00 981.00 17
2000-01-08 Perforation 964.00 966.00 17
2000-01-08 Perforation 968.50 969.50 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1986 1276 0.0 0.0 0.0
1987 7375 0.0 0.0 0.0
1988 7635 0.0 0.0 0.0
1989 8451 0.0 0.0 0.0
1990 8668 0.0 0.0 0.0
1991 8476 0.0 0.0 0.0
1992 8561 0.0 0.0 0.0
1993 8354 0.0 0.0 0.0
1994 8325 0.0 0.0 0.0
1995 8583 0.0 0.0 0.0
1996 7877 0.0 0.0 0.0
1997 6437 0.0 0.0 0.0
1998 8283 0.0 0.0 0.0
1999 8092 0.0 0.0 0.0
2000 8553 0.0 0.0 0.0
2001 8140 0.0 0.0 0.0
2002 8288 0.0 0.0 0.0
2003 8115 0.0 0.0 0.0
2004 7285 0.0 0.0 0.0
2005 4799 0.0 0.0 0.0
2006 5690 0.0 0.0 0.0
2007 2298 0.0 0.0 0.0

For data sources see[5]

References