X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404131609000

Well Details

Well ID: 0404131609000
Loading map...
Location: 00/09-16-040-13W4/0
Location Alias: 00/09-16-40-13 W4M
Location Alias 2: 00/09-16-040-13 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 13
Section: 16
County/Municipality: Flagstaff County
Well Name: PRED C-3 HALKIRKE 9-16-40-13
Operator Name: Canadian Coyote Energy Ltd.
License Number: 0134672
License Date: 1988-06-29
License Status: Abandoned
Spud Date: 1988-09-01
Final Drill Date: 1988-09-04
Well Total Depth: 1053.00 m
Surface Hole Latitude: 52.444330
Surface Hole Longitude: -111.806489

For data sources see[1][2]

Well History

Date Event
1988-06-29 Obtained License
1988-09-01 Direction Drilling Operation Performed - Deviate
1988-09-02 Surface Casing Operation Performed
1988-09-04 Finished Drilling
1988-09-04 Well Log Performed
1988-09-04 Well Mode changed to Drilled and Cased
1988-09-05 Production Casing Operation Performed
1988-09-05 Rig Released
1988-09-15 Well Log Performed
1988-10-05 Perforation Treatment Performed - Jet Perforation
1988-10-05 Well Log Performed
1988-12-02 Well Began Production
1988-12-02 Well Fluid changed to Crude Oil
1988-12-02 Well Mode changed to Pumping
1991-04-19 Perforation Treatment Performed - Jet Perforation
1991-04-19 Well Log Performed
1999-03-07 Perforation Treatment Performed - Jet Perforation
1999-03-07 Well Fluid changed to Crude Oil
1999-03-07 Well Log Performed
1999-03-07 Well Mode changed to Suspended
1999-03-10 Well Fluid changed to Crude Oil
1999-03-10 Well Mode changed to Flowing
1999-08-20 Well Fluid changed to Crude Oil
1999-08-20 Well Mode changed to Pumping
2012-12-01 Well Fluid changed to Crude Oil
2012-12-01 Well Mode changed to Suspended
2017-10-17 Perforation Treatment Performed - Abrasa-Jet Perforation
2017-10-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-10-17 Plug Back Performed
2017-10-17 Well Fluid changed to Crude Oil
2017-10-17 Well Mode changed to Abandoned Zone
2017-10-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-10-18 Perforation Treatment Performed - Cement Squeeze
2017-10-18 Plug Back Performed
2017-12-06 Well Abandoned
2017-12-06 Well Fluid changed to Crude Oil
2017-12-06 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1988-09-01 409.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-10-05 Perforation 1013.30 1014.00 13
1991-04-19 Perforation 1015.00 1017.00 13
1999-03-07 Perforation 1010.50 1013.50 17
2017-10-17 Packing Device Capped w/Cement 992.00 1002.00 0
2017-10-17 Hydra Jet Perforation 321.00 322.00 0
2017-10-18 Cement Squeeze 321.00 322.00 0
2017-10-18 Packing Device Capped w/Cement 298.50 316.10 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1988 744 0.0 0.0 0.0
1989 8688 0.0 0.0 0.0
1990 8689 0.0 0.0 0.0
1991 8737 0.0 0.0 0.0
1992 8592 0.0 0.0 0.0
1993 8446 0.0 0.0 0.0
1994 8066 0.0 0.0 0.0
1995 8741 0.0 0.0 0.0
1996 8774 0.0 0.0 0.0
1997 8626 0.0 0.0 0.0
1998 7682 0.0 0.0 0.0
1999 7584 0.0 0.0 0.0
2000 8779 0.0 0.0 0.0
2001 8650 0.0 0.0 0.0
2002 8434 0.0 0.0 0.0
2003 8700 0.0 0.0 0.0
2004 8602 0.0 0.0 0.0
2005 7892 0.0 0.0 0.0
2006 7826 0.0 0.0 0.0
2007 6226 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-10-16 No Incident Encountered 0.00 0.00

For data sources see[7]

References