X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404131609020

Well Details

Well ID: 0404131609020
Loading map...
Location: 02/09-16-040-13W4/0
Location Alias: 02/09-16-40-13 W4M
Location Alias 2: 02/09-16-040-13 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 13
Section: 16
County/Municipality: Flagstaff County
Well Name: PC HALKIRK EAST 7-16-40-13
Operator Name: Canlin Energy Corporation
License Number: 0134673
License Date: 1988-06-29
License Status: Abandoned
Spud Date: 1988-09-09
Final Drill Date: 1988-09-13
Well Total Depth: 1056.00 m
Surface Hole Latitude: 52.443334
Surface Hole Longitude: -111.805326

For data sources see[1][2]

Well History

Date Event
1988-06-29 Obtained License
1988-09-10 Surface Casing Operation Performed
1988-09-11 Direction Drilling Operation Performed - Deviate
1988-09-13 Finished Drilling
1988-09-13 Well Log Performed
1988-09-13 Well Mode changed to Drilled and Cased
1988-09-14 Production Casing Operation Performed
1988-09-14 Rig Released
1988-09-21 Well Log Performed
1988-09-30 Perforation Treatment Performed - Jet Perforation
1988-09-30 Well Log Performed
1988-12-02 Well Began Production
1988-12-02 Well Fluid changed to Crude Oil
1988-12-02 Well Mode changed to Pumping
1993-01-13 Perforation Treatment Performed - Cement Plug
1993-01-13 Plug Back Performed
1993-01-13 Well Fluid changed to Crude Oil
1993-01-13 Well Mode changed to Abandoned and Whipstocked
1995-09-26 Perforation Treatment Performed - Jet Perforation
1995-09-27 Perforation Treatment Performed - Cement Plug
1995-09-27 Perforation Treatment Performed - Remedial Casing
1995-10-22 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1988-09-11 620.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-09-30 Perforation 1017.50 1018.30 13
1993-01-13 Cement Plug 805.00 1040.00 0
1995-09-26 Perforation 314.00 315.00 13
1995-09-27 Remedial Casing Cementing 314.00 315.00 0
1995-09-27 Cement Plug 265.00 315.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1988 744 0.0 0.0 0.0
1989 8692 0.0 0.0 0.0
1990 8693 0.0 0.0 0.0
1991 8737 0.0 0.0 0.0
1992 8624 0.0 0.0 0.0
1993 72 0.0 0.0 0.0

For data sources see[6]

References