If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0404133609030 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.482275,"lon":-111.735952,"icon":""}]} |
Location: 03/09-36-040-13W4/0 | |
Location Alias: 03/09-36-40-13 W4M | |
Location Alias 2: 03/09-36-040-13 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 040 | |
Meridian: 4 | |
Range: 13 | |
Section: 36 | |
County/Municipality: Flagstaff County | |
Well Name: PRED HZ 03 ALLI 9-36-40-13 | |
Operator Name: Pismo Energy Ltd. | |
License Number: 0227459 | |
License Date: 1999-10-14 | |
License Status: Issued | |
Spud Date: 1999-10-30 | |
Final Drill Date: 1999-11-10 | |
Well Total Depth: 1377.00 m | |
Surface Hole Latitude: 52.482275 | |
Surface Hole Longitude: -111.735952 |
Date | Event |
---|---|
1999-10-14 | Obtained License |
1999-10-31 | Surface Casing Operation Performed |
1999-11-02 | Direction Drilling Operation Performed - Horizontal |
1999-11-07 | Production Casing Operation Performed |
1999-11-10 | Finished Drilling |
1999-11-10 | Well Log Performed |
1999-11-11 | Rig Released |
1999-11-11 | Well Log Performed |
1999-11-11 | Well Mode changed to Drilled and Cased |
1999-11-12 | Perforation Treatment Performed - Open-Hole Completion |
1999-11-19 | Well Began Production |
1999-11-19 | Well Fluid changed to Crude Oil |
1999-11-19 | Well Mode changed to Pumping |
2001-06-03 | Well Log Performed |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1999-11-02 | 830.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1999-11-12 | Open Hole/Barefoot Completion | 1053.70 | 1377.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1999 | 1032 | 0.0 | 0.0 | 0.0 |
2000 | 8380 | 0.0 | 0.0 | 0.0 |
2001 | 8480 | 0.0 | 0.0 | 0.0 |
2002 | 7870 | 0.0 | 0.0 | 0.0 |
2003 | 8436 | 0.0 | 0.0 | 0.0 |
2004 | 7083 | 0.0 | 0.0 | 0.0 |
2005 | 7161 | 0.0 | 0.0 | 0.0 |
2006 | 7594 | 0.0 | 0.0 | 0.0 |
2007 | 8320 | 0.0 | 0.0 | 0.0 |
2008 | 4181 | 0.0 | 0.0 | 0.0 |
2010 | 5469 | 0.0 | 0.0 | 0.0 |
2011 | 6292 | 0.0 | 0.0 | 0.0 |
2012 | 8709 | 0.0 | 0.0 | 0.0 |
2013 | 8471 | 0.0 | 0.0 | 0.0 |
2014 | 8454 | 0.0 | 0.0 | 0.0 |
2015 | 5852 | 0.0 | 0.0 | 0.0 |
For data sources see[6]