X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404140513020

Well Details

Well ID: 0404140513020
Loading map...
Location: 02/13-05-040-14W4/0
Location Alias: 02/13-05-40-14 W4M
Location Alias 2: 02/13-05-040-14 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 14
Section: 05
County/Municipality: County of Paintearth No. 18
Well Name: KARVE PROVOST 13-5-40-14
Operator Name: Karve Energy Inc.
License Number: 0447179
License Date: 2012-07-17
License Status: Abandoned
Spud Date: 2012-07-31
Final Drill Date: 2012-08-05
Well Total Depth: 2347.00 m
Surface Hole Latitude: 52.417643
Surface Hole Longitude: -111.971109

For data sources see[1][2]

Well History

Date Event
2012-07-17 Obtained License
2012-08-01 Surface Casing Operation Performed
2012-08-02 Direction Drilling Operation Performed - Deviate
2012-08-02 Direction Drilling Operation Performed - Horizontal
2012-08-03 Intermediate Casing Operation Performed
2012-08-03 Well Log Performed
2012-08-05 Finished Drilling
2012-08-05 Perforation Treatment Performed - Open-Hole Completion
2012-08-05 Well Mode changed to Drilled and Cased
2012-08-06 Liner Casing Operation Performed
2012-08-06 Well Log Performed
2012-08-07 Rig Released
2012-08-11 Well Log Performed
2012-08-20 Perforation Treatment Performed - Multi-Stage Fracture
2012-10-02 Well Began Production
2012-10-02 Well Fluid changed to Crude Oil
2012-10-02 Well Mode changed to Pumping
2015-10-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-10-18 Plug Back Performed
2015-10-18 Well Fluid changed to Crude Oil
2015-10-18 Well Mode changed to Abandoned Zone
2015-10-30 Well Log Performed
2015-11-02 Perforation Treatment Performed - Jet Perforation
2015-11-02 Well Log Performed
2015-11-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-11-03 Perforation Treatment Performed - Cement Squeeze
2015-11-03 Plug Back Performed
2015-11-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-11-04 Perforation Treatment Performed - Cement Squeeze
2015-11-04 Perforation Treatment Performed - Jet Perforation
2015-11-04 Plug Back Performed
2015-11-04 Well Log Performed
2015-11-05 Perforation Treatment Performed - Jet Perforation
2015-11-05 Well Log Performed
2015-11-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-11-06 Perforation Treatment Performed - Cement Squeeze
2015-11-06 Plug Back Performed
2015-11-07 Well Log Performed
2015-11-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-11-09 Perforation Treatment Performed - Cement Squeeze
2015-11-09 Perforation Treatment Performed - Jet Perforation
2015-11-09 Plug Back Performed
2015-11-10 Perforation Treatment Performed - Jet Perforation
2015-11-10 Well Log Performed
2015-11-12 Well Log Performed
2015-11-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-11-13 Perforation Treatment Performed - Cement Squeeze
2015-11-13 Plug Back Performed
2015-11-13 Well Log Performed
2015-11-16 Perforation Treatment Performed - Jet Perforation
2015-11-16 Well Log Performed
2015-11-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-11-17 Perforation Treatment Performed - Cement Squeeze
2015-11-17 Plug Back Performed
2015-11-19 Perforation Treatment Performed - Cement Squeeze
2015-11-19 Perforation Treatment Performed - Jet Perforation
2015-11-19 Plug Back Performed
2015-11-19 Well Log Performed
2015-11-25 Well Log Performed
2015-11-26 Perforation Treatment Performed - Jet Perforation
2015-11-26 Well Log Performed
2015-11-28 Perforation Treatment Performed - Cement Squeeze
2015-11-28 Plug Back Performed
2015-12-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-12-16 Plug Back Performed
2016-01-15 Well Abandoned
2016-01-15 Well Fluid changed to Crude Oil
2016-01-15 Well Mode changed to Abandoned

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-07-31 Bonanza Drilling Inc. 1 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-08-02 576.00 Deviate (5 - 79 degrees)
2012-08-02 1009.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-08-05 Open Hole/Barefoot Completion 2341.00 2347.00 0
2012-08-20 Multi-Stage Fracture 1727.20 1727.40 0
2012-08-20 Multi-Stage Fracture 1657.00 1657.20 0
2012-08-20 Multi-Stage Fracture 1572.60 1572.80 0
2012-08-20 Multi-Stage Fracture 1502.90 1503.10 0
2012-08-20 Multi-Stage Fracture 1418.00 1418.20 0
2012-08-20 Multi-Stage Fracture 1348.30 1348.50 0
2012-08-20 Multi-Stage Fracture 1278.00 1278.20 0
2012-08-20 Multi-Stage Fracture 1209.30 1209.50 0
2015-10-18 Packing Device Capped w/Cement 946.00 1009.00 0
2015-11-02 Perforation 764.50 766.50 20
2012-08-20 Multi-Stage Fracture 2325.80 2326.20 0
2015-11-03 Cement Squeeze 764.50 766.50 0
2015-11-03 Packing Device Capped w/Cement 752.00 760.00 0
2015-11-04 Perforation 733.00 735.00 20
2015-11-04 Cement Squeeze 733.00 735.00 0
2015-11-04 Packing Device Capped w/Cement 717.00 725.00 0
2015-11-05 Perforation 567.50 569.50 20
2015-11-06 Cement Squeeze 567.50 569.50 0
2015-11-06 Packing Device Capped w/Cement 554.00 562.00 0
2015-11-09 Perforation 354.50 356.50 20
2015-11-09 Cement Squeeze 354.50 356.50 0
2012-08-20 Multi-Stage Fracture 2256.10 2256.30 0
2015-11-09 Packing Device Capped w/Cement 342.00 350.00 0
2015-11-10 Perforation 251.00 253.00 20
2015-11-13 Cement Squeeze 251.00 253.00 0
2015-11-13 Packing Device Capped w/Cement 225.60 235.00 0
2015-11-16 Perforation 221.00 223.00 20
2015-11-17 Cement Squeeze 221.00 223.00 0
2015-11-17 Packing Device Capped w/Cement 210.00 218.00 0
2015-11-19 Perforation 190.00 192.00 20
2015-11-19 Cement Squeeze 190.00 192.00 0
2015-11-26 Perforation 173.00 175.00 20
2012-08-20 Multi-Stage Fracture 2171.80 2172.00 0
2015-11-26 Perforation 171.00 173.00 20
2015-11-28 Cement Squeeze 171.00 175.00 0
2015-12-16 Packing Device Capped w/Cement 161.00 169.00 0
2012-08-20 Multi-Stage Fracture 2106.70 2106.90 0
2012-08-20 Multi-Stage Fracture 1994.70 1994.90 0
2012-08-20 Multi-Stage Fracture 1923.90 1924.10 0
2012-08-20 Multi-Stage Fracture 1866.60 1866.80 0
2012-08-20 Multi-Stage Fracture 1796.40 1796.60 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 2166 0.0 0.0 0.0
2013 6736 0.0 0.0 0.0
2014 6555 0.0 0.0 0.0
2015 460 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-08-07 No Incident Encountered 0.00 0.00
2012-08-24 No Incident Encountered 0.00 0.00
2015-10-18 No Incident Encountered 0.00 0.00
2015-12-16 No Incident Encountered 0.00 0.00

For data sources see[8]

References