X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404141003000

Well Details

Well ID: 0404141003000
Loading map...
Location: 00/03-10-040-14W4/0
Location Alias: 00/03-10-40-14 W4M
Location Alias 2: 00/03-10-040-14 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 14
Section: 10
County/Municipality: County of Paintearth No. 18
Well Name: KARVE PROVOST 3-10-40-14
Operator Name: Karve Energy Inc.
License Number: 0453134
License Date: 2013-01-04
License Status: Issued
Spud Date: 2013-01-17
Final Drill Date: 2013-01-22
Well Total Depth: 2491.00 m
Surface Hole Latitude: 52.436321
Surface Hole Longitude: -111.937463

For data sources see[1][2]

Well History

Date Event
2013-01-04 Obtained License
2013-01-18 Surface Casing Operation Performed
2013-01-19 Direction Drilling Operation Performed - Deviate
2013-01-19 Direction Drilling Operation Performed - Horizontal
2013-01-22 Finished Drilling
2013-01-22 Rig Released
2013-01-22 Well Log Performed
2013-01-22 Well Mode changed to Drilled and Cased
2013-01-23 Production Casing Operation Performed
2013-01-28 Well Log Performed
2013-02-12 Perforation Treatment Performed - Abrasa-Jet Perforation
2013-02-12 Perforation Treatment Performed - Fractured
2013-02-12 Perforation Treatment Performed - Multi-Stage Fracture
2013-02-13 Perforation Treatment Performed - Multi-Stage Fracture
2013-02-14 Perforation Treatment Performed - Multi-Stage Fracture
2013-03-20 Well Began Production
2013-03-20 Well Fluid changed to Crude Oil
2013-03-20 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2013-01-17 Bonanza Drilling Inc. 3 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2013-01-19 504.10 Deviate (5 - 79 degrees)
2013-01-19 1034.70 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2013-02-12 Hydra Jet Perforation 2462.30 2462.40 0
2013-02-13 Multi-Stage Fracture 2041.50 2045.40 0
2013-02-13 Multi-Stage Fracture 2010.30 2014.20 0
2013-02-13 Multi-Stage Fracture 1965.50 1969.40 0
2013-02-13 Multi-Stage Fracture 1812.60 1816.50 0
2013-02-13 Multi-Stage Fracture 1781.40 1785.30 0
2013-02-13 Multi-Stage Fracture 1736.80 1740.80 0
2013-02-13 Multi-Stage Fracture 1624.50 1628.40 0
2013-02-13 Multi-Stage Fracture 1579.60 1583.50 0
2013-02-13 Multi-Stage Fracture 1521.20 1525.10 0
2013-02-13 Multi-Stage Fracture 1377.70 1381.70 0
2013-02-12 Fracture 2462.30 2462.40 0
2013-02-13 Multi-Stage Fracture 1333.00 1336.90 0
2013-02-13 Multi-Stage Fracture 1288.10 1292.00 0
2013-02-13 Multi-Stage Fracture 1243.20 1247.10 0
2013-02-13 Multi-Stage Fracture 1212.00 1215.90 0
2013-02-13 Multi-Stage Fracture 1180.70 1184.70 0
2013-02-13 Multi-Stage Fracture 1149.50 1153.40 0
2013-02-14 Multi-Stage Fracture 1091.20 1095.10 0
2013-02-12 Multi-Stage Fracture 2367.10 2371.00 0
2013-02-12 Multi-Stage Fracture 2336.70 2340.60 0
2013-02-12 Multi-Stage Fracture 2305.50 2309.40 0
2013-02-12 Multi-Stage Fracture 2260.60 2264.60 0
2013-02-12 Multi-Stage Fracture 2203.00 2206.90 0
2013-02-12 Multi-Stage Fracture 2158.50 2162.40 0
2013-02-12 Multi-Stage Fracture 2086.40 2090.30 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-02-12 2013-02-14 870 1,277 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 80.4874 N/A
16/30 Sand Calfrac Crystalline silica (Quartz) 14808-60-7 100 17.0306 N/A
15% HCl Calfrac Acid Hydrochloric acid 7647-01-0 100 1.1706 N/A
Water 7732-18-5 100 1.1706 N/A
DWP-905 Calfrac Breaker 1.2-Ethanediol 107-21-1 100 0.1065 N/A
Non-Hazardous Ingredients Trade Secret 100 0.1053 N/A
DWP-107 Calfrac Buffer Non-Hazardous Ingredients Trade Secret 100 0.1227 N/A
Organic acid 8454 100 0.1227 N/A
DWP-123 Calfrac Crosslinker Borate salt 8293 100 0.1613 N/A
Non-Hazardous Ingredients Trade Secret 100 0.1614 N/A
Potassium hydroxide (K(OH)) 1310-58-3 100 0.1688 N/A
DWP-949 Calfrac Demulsifier Ethoxylated alcohols 8300 100 0.1125 N/A
Ethoxylated phenolic resin 8300 100 0.1184 N/A
Isobutyl ketone 8300 100 0.1135 N/A
Non-Hazardous Ingredients Trade Secret 100 0.1606 N/A
Organic acid salts 1 8300 100 0.1125 N/A
Organic acid salts 2 8300 100 0.1179 N/A
Organic acid salts 3 8300 100 0.1184 N/A
DWP-101 Calfrac Gelling Agent Guar gum 9000-30-0 100 0.6794 N/A
Non-Hazardous Ingredients Trade Secret 100 0.6791 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2013-02-01 2013-02-07 Municipal Water 1050

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2013 6312 0.0 0.0 0.0
2014 8235 0.0 0.0 0.0
2015 1032 0.0 0.0 0.0
2016 5144 0.0 0.0 0.0
2017 4878 0.0 0.0 0.0
2018 6376 0.0 0.0 0.0
2019 2616 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-01-22 No Incident Encountered 0.00 0.00
2013-03-03 No Incident Encountered 0.00 0.00

For data sources see[10]

References