X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404141007000

Well Details

Well ID: 0404141007000
Loading map...
Location: 00/07-10-040-14W4/0
Location Alias: 00/07-10-40-14 W4M
Location Alias 2: 00/07-10-040-14 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 14
Section: 10
County/Municipality: County of Paintearth No. 18
Well Name: ACL HALKIRK EAST 7-10-40-14
Operator Name: Paramount Resources Ltd.
License Number: 0022683
License Date: 1962-07-06
License Status: RecCertified
Spud Date: 1962-07-07
Final Drill Date: 1962-07-13
Well Total Depth: 1065.30 m
Surface Hole Latitude: 52.424764
Surface Hole Longitude: -111.933278

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1962-07-06 Obtained License
1962-07-12 Drill Stem Test Performed
1962-07-13 Finished Drilling
1962-07-14 Drill Stem Test Performed
1962-07-15 Drill Stem Test Performed
1962-07-16 Production Casing Operation Performed
1962-07-16 Well Mode changed to Drilled and Cased
1964-06-29 Perforation Treatment Performed - Bullet Perforation
1964-06-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-08-21 Well Began Injection
1964-08-21 Well Fluid changed to Water
1964-08-21 Well Type changed to Disposal
1967-11-20 Well Fluid changed to Water
1967-11-20 Well Mode changed to Suspended
1967-11-20 Well Type changed to Disposal
1991-01-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1991-01-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1991-01-27 Plug Back Performed
1991-01-27 Well Fluid changed to Water
1991-01-27 Well Mode changed to Abandoned Zone
1991-01-27 Well Type changed to Disposal
1991-01-29 Perforation Treatment Performed - Jet Perforation
1991-01-29 Plug Back Performed
1999-07-26 Well Log Performed
1999-07-27 Well Log Performed
1999-09-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-09-23 Perforation Treatment Performed - Jet Perforation
1999-09-23 Plug Back Performed
1999-09-23 Well Log Performed
1999-10-04 Perforation Treatment Performed - Fractured
2000-05-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-05-31 Perforation Treatment Performed - Jet Perforation
2000-05-31 Plug Back Performed
2000-05-31 Well Log Performed
2000-06-01 Perforation Treatment Performed - Cement Plug
2000-06-01 Perforation Treatment Performed - Remedial Casing
2000-06-13 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1964-06-29 Bullet Perforation 1046.70 1048.20 10
2000-05-31 Perforation 246.00 247.00 20
2000-06-01 Remedial Casing Cementing 246.00 247.00 0
2000-06-01 Cement Plug 153.10 247.00 0
1964-06-30 Acid Treatment 1046.70 1048.20 0
1991-01-25 Packing Device Capped w/Cement 1026.50 1030.50 0
1991-01-27 Packing Device Capped w/Cement 1004.00 1012.00 0
1991-01-29 Perforation 995.80 998.80 13
1999-09-23 Packing Device Capped w/Cement 982.00 990.00 0
1999-09-23 Perforation 864.00 866.00 14
1999-10-04 Fracture 864.00 866.00 0
2000-05-31 Packing Device Capped w/Cement 846.00 848.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0

For data sources see[5]

References