X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404141714000

Well Details

Well ID: 0404141714000
Loading map...
Location: 00/14-17-040-14W4/0
Location Alias: 00/14-17-40-14 W4M
Location Alias 2: 00/14-17-040-14 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 14
Section: 17
County/Municipality: County of Paintearth No. 18
Well Name: KARVE PROVOST 14-17-40-14
Operator Name: Karve Energy Inc.
License Number: 0448827
License Date: 2012-10-01
License Status: Issued
Spud Date: 2012-10-05
Final Drill Date: 2012-10-08
Well Total Depth: 1682.00 m
Surface Hole Latitude: 52.438756
Surface Hole Longitude: -111.987478

For data sources see[1][2]

Well History

Date Event
2012-10-01 Obtained License
2012-10-05 Surface Casing Operation Performed
2012-10-07 Direction Drilling Operation Performed - Deviate
2012-10-08 Direction Drilling Operation Performed - Horizontal
2012-10-08 Finished Drilling
2012-10-08 Production Casing Operation Performed
2012-10-08 Well Log Performed
2012-10-08 Well Mode changed to Drilled and Cased
2012-10-09 Rig Released
2012-10-11 Well Log Performed
2012-10-19 Perforation Treatment Performed - Multi-Stage Fracture
2012-10-20 Perforation Treatment Performed - Multi-Stage Fracture
2012-12-12 Well Began Production
2012-12-12 Well Fluid changed to Crude Oil
2012-12-12 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-10-05 Bonanza Drilling Inc. 1 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-10-07 507.60 Deviate (5 - 79 degrees)
2012-10-08 1036.80 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-10-19 Multi-Stage Fracture 1651.60 1655.60 0
2012-10-20 Multi-Stage Fracture 1102.20 1106.10 0
2012-10-19 Multi-Stage Fracture 1585.00 1588.90 0
2012-10-19 Multi-Stage Fracture 1527.10 1531.10 0
2012-10-19 Multi-Stage Fracture 1484.00 1487.90 0
2012-10-19 Multi-Stage Fracture 1395.30 1399.20 0
2012-10-20 Multi-Stage Fracture 1320.10 1324.00 0
2012-10-20 Multi-Stage Fracture 1289.20 1293.10 0
2012-10-20 Multi-Stage Fracture 1190.90 1194.90 0
2012-10-20 Multi-Stage Fracture 1133.10 1137.10 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 452 0.0 0.0 0.0
2013 8264 0.0 0.0 0.0
2014 8448 0.0 0.0 0.0
2015 8250 0.0 0.0 0.0
2016 8306 0.0 0.0 0.0
2017 8532 0.0 0.0 0.0
2018 8669 0.0 0.0 0.0
2019 8217 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-10-09 No Incident Encountered 0.00 0.00
2012-11-09 No Incident Encountered 0.00 0.00

For data sources see[8]

References