X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404141716020

Well Details

Well ID: 0404141716020
Loading map...
Location: 02/16-17-040-14W4/0
Location Alias: 02/16-17-40-14 W4M
Location Alias 2: 02/16-17-040-14 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 14
Section: 17
County/Municipality: County of Paintearth No. 18
Well Name: KARVE PROVOST 16-17-40-14
Operator Name: Karve Energy Inc.
License Number: 0458353
License Date: 2013-08-01
License Status: Issued
Spud Date: 2013-09-22
Final Drill Date: 2013-09-27
Well Total Depth: 2355.00 m
Surface Hole Latitude: 52.432968
Surface Hole Longitude: -111.978464

For data sources see[1][2]

Well History

Date Event
2013-08-01 Obtained License
2013-09-07 Well Log Performed
2013-09-23 Surface Casing Operation Performed
2013-09-24 Direction Drilling Operation Performed - Deviate
2013-09-24 Direction Drilling Operation Performed - Horizontal
2013-09-27 Finished Drilling
2013-09-27 Well Log Performed
2013-09-27 Well Mode changed to Drilled and Cased
2013-09-28 Production Casing Operation Performed
2013-09-28 Rig Released
2013-10-01 Perforation Treatment Performed - Open-Hole Completion
2013-10-02 Well Log Performed
2013-10-18 Perforation Treatment Performed - Multi-Stage Fracture
2013-10-19 Perforation Treatment Performed - Multi-Stage Fracture
2013-11-08 Well Fluid changed to Crude Oil
2013-11-08 Well Mode changed to Drilling and Completing
2014-01-01 Well Began Production
2014-01-01 Well Fluid changed to Crude Oil
2014-01-01 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2013-09-22 Bonanza Drilling Inc. 3 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2013-09-24 640.20 Deviate (5 - 79 degrees)
2013-09-24 1043.40 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2013-10-01 Open Hole/Barefoot Completion 2350.00 2355.00 0
2013-10-19 Multi-Stage Fracture 1896.30 1897.30 0
2013-10-19 Multi-Stage Fracture 1848.10 1849.10 0
2013-10-19 Multi-Stage Fracture 1813.40 1814.40 0
2013-10-19 Multi-Stage Fracture 1751.80 1752.80 0
2013-10-19 Multi-Stage Fracture 1703.60 1704.60 0
2013-10-19 Multi-Stage Fracture 1642.00 1643.00 0
2013-10-19 Multi-Stage Fracture 1546.70 1547.70 0
2013-10-19 Multi-Stage Fracture 1498.40 1499.40 0
2013-10-19 Multi-Stage Fracture 1439.00 1440.00 0
2013-10-19 Multi-Stage Fracture 1377.90 1378.90 0
2013-10-18 Multi-Stage Fracture 2320.30 2321.30 0
2013-10-19 Multi-Stage Fracture 1329.60 1330.60 0
2013-10-19 Multi-Stage Fracture 1281.50 1282.50 0
2013-10-19 Multi-Stage Fracture 1219.90 1220.90 0
2013-10-19 Multi-Stage Fracture 1171.70 1172.70 0
2013-10-19 Multi-Stage Fracture 1112.00 1113.00 0
2013-10-19 Multi-Stage Fracture 1066.00 1067.00 0
2013-10-18 Multi-Stage Fracture 2275.30 2276.30 0
2013-10-18 Multi-Stage Fracture 2216.80 2217.80 0
2013-10-18 Multi-Stage Fracture 2171.70 2172.70 0
2013-10-18 Multi-Stage Fracture 2113.10 2114.10 0
2013-10-18 Multi-Stage Fracture 2068.10 2069.10 0
2013-10-18 Multi-Stage Fracture 2006.80 2007.80 0
2013-10-19 Multi-Stage Fracture 1958.30 1959.30 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-10-18 2013-10-19 881 442 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 55.7104 N/A
FRAC SAND. 16/30 WHITE (OTTAWA TYPE) Baker Hughes Crystalline Silica (Quartz) 14808-60-7 100 23.3275 N/A
FRAC SAND.70/140 OR 50/140 CANADIAN Baker Hughes Crystalline Silica (Quartz) 14808-60-7 100 1.5594 N/A
CC-2 Baker Hughes Clay Control Non-hazardous Not Available 100 0.1234 N/A
Nitrogen Baker Hughes Energizing Fluid Nitrogen 7727-37-9 100 18.6848 N/A
FAC-1W Baker Hughes Gelling Agent Isopropanol 67-63-0 100 0.056 N/A
N.N-Dimethyloctadecylamine 124-28-7 100 0.0561 N/A
N.N-Dimethyloctadecylamine hydrochloride 1613-17-8 100 0.0561 N/A
Trimethyloctadecylammonium chloride 112-03-8 100 0.056 N/A
FAC-3W Baker Hughes Gelling Agent Isopropanol 67-63-0 100 0.538 N/A
Sodium xylene sulphonate 1300-72-7 100 0.538 N/A
Trimethyloctadecylammonium chloride 112-03-8 100 0.538 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2013-10-11 2013-10-16 Municipal Water 397

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2013 0 0.0 0.0 0.0
2014 8453 0.0 0.0 0.0
2015 8668 0.0 0.0 0.0
2016 8728 0.0 0.0 0.0
2017 8720 0.0 0.0 0.0
2018 8727 0.0 0.0 0.0
2019 7688 0.0 0.0 0.0
2020 2102 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-09-28 No Incident Encountered 0.00 0.00
2013-11-04 No Incident Encountered 0.00 0.00

For data sources see[10]

References