If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0404141716020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.432968,"lon":-111.978464,"icon":""}]} |
| Location: 02/16-17-040-14W4/0 | |
| Location Alias: 02/16-17-40-14 W4M | |
| Location Alias 2: 02/16-17-040-14 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 040 | |
| Meridian: 4 | |
| Range: 14 | |
| Section: 17 | |
| County/Municipality: County of Paintearth No. 18 | |
| Well Name: KARVE PROVOST 16-17-40-14 | |
| Operator Name: Karve Energy Inc. | |
| License Number: 0458353 | |
| License Date: 2013-08-01 | |
| License Status: Issued | |
| Spud Date: 2013-09-22 | |
| Final Drill Date: 2013-09-27 | |
| Well Total Depth: 2355.00 m | |
| Surface Hole Latitude: 52.432968 | |
| Surface Hole Longitude: -111.978464 |
| Date | Event |
|---|---|
| 2013-08-01 | Obtained License |
| 2013-09-07 | Well Log Performed |
| 2013-09-23 | Surface Casing Operation Performed |
| 2013-09-24 | Direction Drilling Operation Performed - Deviate |
| 2013-09-24 | Direction Drilling Operation Performed - Horizontal |
| 2013-09-27 | Finished Drilling |
| 2013-09-27 | Well Log Performed |
| 2013-09-27 | Well Mode changed to Drilled and Cased |
| 2013-09-28 | Production Casing Operation Performed |
| 2013-09-28 | Rig Released |
| 2013-10-01 | Perforation Treatment Performed - Open-Hole Completion |
| 2013-10-02 | Well Log Performed |
| 2013-10-18 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2013-10-19 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2013-11-08 | Well Fluid changed to Crude Oil |
| 2013-11-08 | Well Mode changed to Drilling and Completing |
| 2014-01-01 | Well Began Production |
| 2014-01-01 | Well Fluid changed to Crude Oil |
| 2014-01-01 | Well Mode changed to Pumping |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2013-09-22 | Bonanza Drilling Inc. | 3 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2013-09-24 | 640.20 | Deviate (5 - 79 degrees) |
| 2013-09-24 | 1043.40 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2013-10-01 | Open Hole/Barefoot Completion | 2350.00 | 2355.00 | 0 |
| 2013-10-19 | Multi-Stage Fracture | 1896.30 | 1897.30 | 0 |
| 2013-10-19 | Multi-Stage Fracture | 1848.10 | 1849.10 | 0 |
| 2013-10-19 | Multi-Stage Fracture | 1813.40 | 1814.40 | 0 |
| 2013-10-19 | Multi-Stage Fracture | 1751.80 | 1752.80 | 0 |
| 2013-10-19 | Multi-Stage Fracture | 1703.60 | 1704.60 | 0 |
| 2013-10-19 | Multi-Stage Fracture | 1642.00 | 1643.00 | 0 |
| 2013-10-19 | Multi-Stage Fracture | 1546.70 | 1547.70 | 0 |
| 2013-10-19 | Multi-Stage Fracture | 1498.40 | 1499.40 | 0 |
| 2013-10-19 | Multi-Stage Fracture | 1439.00 | 1440.00 | 0 |
| 2013-10-19 | Multi-Stage Fracture | 1377.90 | 1378.90 | 0 |
| 2013-10-18 | Multi-Stage Fracture | 2320.30 | 2321.30 | 0 |
| 2013-10-19 | Multi-Stage Fracture | 1329.60 | 1330.60 | 0 |
| 2013-10-19 | Multi-Stage Fracture | 1281.50 | 1282.50 | 0 |
| 2013-10-19 | Multi-Stage Fracture | 1219.90 | 1220.90 | 0 |
| 2013-10-19 | Multi-Stage Fracture | 1171.70 | 1172.70 | 0 |
| 2013-10-19 | Multi-Stage Fracture | 1112.00 | 1113.00 | 0 |
| 2013-10-19 | Multi-Stage Fracture | 1066.00 | 1067.00 | 0 |
| 2013-10-18 | Multi-Stage Fracture | 2275.30 | 2276.30 | 0 |
| 2013-10-18 | Multi-Stage Fracture | 2216.80 | 2217.80 | 0 |
| 2013-10-18 | Multi-Stage Fracture | 2171.70 | 2172.70 | 0 |
| 2013-10-18 | Multi-Stage Fracture | 2113.10 | 2114.10 | 0 |
| 2013-10-18 | Multi-Stage Fracture | 2068.10 | 2069.10 | 0 |
| 2013-10-18 | Multi-Stage Fracture | 2006.80 | 2007.80 | 0 |
| 2013-10-19 | Multi-Stage Fracture | 1958.30 | 1959.30 | 0 |
For data sources see[6]
| Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
|---|---|---|---|---|---|
| 1 | 2013-10-18 | 2013-10-19 | 881 | 442 | N/A |
| Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
|---|---|---|---|---|---|---|---|---|
| 1 | Water | Not Available | 100 | 55.7104 | N/A | |||
| FRAC SAND. 16/30 WHITE (OTTAWA TYPE) | Baker Hughes | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 23.3275 | N/A | ||
| FRAC SAND.70/140 OR 50/140 CANADIAN | Baker Hughes | Crystalline Silica (Quartz) | 14808-60-7 | 100 | 1.5594 | N/A | ||
| CC-2 | Baker Hughes | Clay Control | Non-hazardous | Not Available | 100 | 0.1234 | N/A | |
| Nitrogen | Baker Hughes | Energizing Fluid | Nitrogen | 7727-37-9 | 100 | 18.6848 | N/A | |
| FAC-1W | Baker Hughes | Gelling Agent | Isopropanol | 67-63-0 | 100 | 0.056 | N/A | |
| N.N-Dimethyloctadecylamine | 124-28-7 | 100 | 0.0561 | N/A | ||||
| N.N-Dimethyloctadecylamine hydrochloride | 1613-17-8 | 100 | 0.0561 | N/A | ||||
| Trimethyloctadecylammonium chloride | 112-03-8 | 100 | 0.056 | N/A | ||||
| FAC-3W | Baker Hughes | Gelling Agent | Isopropanol | 67-63-0 | 100 | 0.538 | N/A | |
| Sodium xylene sulphonate | 1300-72-7 | 100 | 0.538 | N/A | ||||
| Trimethyloctadecylammonium chloride | 112-03-8 | 100 | 0.538 | N/A |
For data sources see[7]
| Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
|---|---|---|---|
| 2013-10-11 | 2013-10-16 | Municipal Water | 397 |
For data sources see[8]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2013 | 0 | 0.0 | 0.0 | 0.0 |
| 2014 | 8453 | 0.0 | 0.0 | 0.0 |
| 2015 | 8668 | 0.0 | 0.0 | 0.0 |
| 2016 | 8728 | 0.0 | 0.0 | 0.0 |
| 2017 | 8720 | 0.0 | 0.0 | 0.0 |
| 2018 | 8727 | 0.0 | 0.0 | 0.0 |
| 2019 | 7688 | 0.0 | 0.0 | 0.0 |
| 2020 | 2102 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2013-09-28 | No Incident Encountered | 0.00 | 0.00 |
| 2013-11-04 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]