X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404150104003

Well Details

Well ID: 0404150104003
Loading map...
Location: 00/04-01-040-15W4/3
Location Alias: 00/04-01-40-15 W4M
Location Alias 2: 00/04-01-040-15 W4/03
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 15
Section: 01
County/Municipality: County of Paintearth No. 18
Well Name: KARVE GALAHAD 4-1-40-15
Operator Name: Karve Energy Inc.
License Number: 0152597
License Date: 1992-06-01
License Status: Issued
Spud Date: 1992-06-06
Final Drill Date: 1992-06-09
Well Total Depth: 1138.00 m
Surface Hole Latitude: 52.408002
Surface Hole Longitude: -112.040491

For data sources see[1][2]

Well History

Date Event
1992-06-01 Obtained License
1992-06-07 Surface Casing Operation Performed
1992-06-09 Finished Drilling
1992-06-09 Well Mode changed to Drilled and Cased
1992-06-10 Drill Stem Test Performed
1992-06-10 Well Log Performed
1992-06-11 Drill Stem Test Performed
1992-06-11 Production Casing Operation Performed
1992-06-11 Rig Released
1992-06-18 Perforation Treatment Performed - Jet Perforation
2001-05-22 Well Log Performed
2001-05-23 Perforation Treatment Performed - Jet Perforation
2001-05-23 Perforation Treatment Performed - Remedial Casing
2001-05-23 Well Log Performed
2001-05-25 Perforation Treatment Performed - Cement Squeeze
2005-02-12 Perforation Treatment Performed - Jet Perforation
2006-02-12 Perforation Treatment Performed - Jet Perforation
2010-03-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-03-28 Perforation Treatment Performed - Jet Perforation
2010-03-28 Plug Back Performed
2010-03-31 Perforation Treatment Performed - Fractured
2010-04-26 Well Began Production
2010-04-26 Well Fluid changed to Gas
2010-04-26 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1992-06-18 Perforation 1097.60 1099.00 18
2006-02-12 Perforation 1082.00 1084.00 17
2006-02-12 Perforation 1076.00 1078.00 17
2010-03-28 Packing Device Capped w/Cement 1064.00 1072.00 0
2010-03-28 Perforation 929.00 935.00 17
2010-03-28 Perforation 923.00 929.00 17
2010-03-28 Perforation 917.00 923.00 17
2010-03-31 Fracture 917.00 935.00 0
1992-06-18 Perforation 1091.00 1093.00 18
2001-05-23 Perforation 290.00 291.00 14
2001-05-23 Remedial Casing Cementing 290.00 291.00 0
2001-05-25 Cement Squeeze 1091.00 1099.00 0
2005-02-12 Perforation 1076.00 1078.00 17
2005-02-12 Perforation 1082.00 1084.00 17
2005-02-12 Perforation 1087.00 1092.00 17
2006-02-12 Perforation 1087.00 1092.00 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 1223 0.0 0.0 0.0
2011 2412 0.0 0.0 0.0
2012 8470 0.0 0.0 0.0
2013 7809 0.0 0.0 0.0
2014 7377 0.0 0.0 0.0
2015 6829 0.0 0.0 0.0
2016 8772 0.0 0.0 0.0
2017 8758 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8549 0.0 0.0 0.0
2020 2160 0.0 0.0 0.0

For data sources see[5]

References