If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0405050506020 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. ![]() |
Location: 02/06-05-040-05W5/0 | |
Location Alias: 02/06-05-40-05 W5M | |
Location Alias 2: 02/06-05-040-05 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 040 | |
Meridian: 5 | |
Range: 05 | |
Section: 05 | |
County/Municipality: Clearwater County | |
Well Name: DEKALB ET AL WILLGR 6-5-40-5 | |
Operator Name: Paramount Resources Ltd. | |
License Number: 0098267 | |
License Date: 1982-10-27 | |
License Status: Issued | |
Spud Date: 1982-11-05 | |
Final Drill Date: 1982-11-29 | |
Well Total Depth: 2495.00 m | |
Surface Hole Latitude: 52.412220 | |
Surface Hole Longitude: -114.686370 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1982-10-27 | Obtained License |
1982-11-20 | Drill Stem Test Performed |
1982-11-26 | Drill Stem Test Performed |
1982-11-29 | Finished Drilling |
1982-11-29 | Well Mode changed to Drilled and Cased |
1982-11-30 | Well Log Performed |
1982-12-01 | Drill Stem Test Performed |
1982-12-03 | Production Casing Operation Performed |
1982-12-16 | Perforation Treatment Performed - Jet Perforation |
1982-12-17 | Perforation Treatment Performed - Cement Squeeze |
1982-12-21 | Perforation Treatment Performed - Jet Perforation |
1983-02-11 | Perforation Treatment Performed - Fractured |
1983-05-27 | Well Began Production |
1983-05-27 | Well Fluid changed to Crude Oil |
1983-05-27 | Well Mode changed to Pumping |
1984-11-30 | Well Log Performed |
1984-12-01 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1984-12-01 | Plug Back Performed |
1984-12-01 | Well Fluid changed to Crude Oil |
1984-12-01 | Well Mode changed to Abandoned Zone |
1984-12-02 | Well Log Performed |
1984-12-03 | Perforation Treatment Performed - Jet Perforation |
1984-12-15 | Perforation Treatment Performed - Fractured |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1982-12-16 | Perforation | 2007.80 | 2008.80 | 13 |
1982-12-17 | Cement Squeeze | 2007.80 | 2008.80 | 0 |
1982-12-21 | Perforation | 2366.00 | 2370.00 | 13 |
1983-02-11 | Fracture | 2366.00 | 2370.00 | 0 |
1984-12-01 | Packing Device Capped w/Cement | 2352.00 | 2360.00 | 0 |
1984-12-03 | Perforation | 2295.00 | 2307.00 | 7 |
1984-12-15 | Fracture | 2295.00 | 2307.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1983 | 4792 | 0.0 | 0.0 | 0.0 |
1984 | 547 | 0.0 | 0.0 | 0.0 |
For data sources see[5]