X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0414011014000

Well Details

Well ID: 0414011014000
Loading map...
Location: 00/14-10-041-01W4/0
Location Alias: 00/14-10-41-01 W4M
Location Alias 2: 00/14-10-041-01 W4/00
Country: Canada
Province: Alberta
Township: 041
Meridian: 4
Range: 01
Section: 10
County/Municipality: Municipal District of Provost No. 52
Well Name: WLEC HAYTER 14-10-41-1
Operator Name: West Lake Energy Corp.
License Number: 0035553
License Date: 1969-01-03
License Status: Abandoned
Spud Date: 1969-01-09
Final Drill Date: 1969-01-13
Well Total Depth: 833.60 m
Surface Hole Latitude: 52.519048
Surface Hole Longitude: -110.068092

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1969-01-03 Obtained License
1969-01-13 Finished Drilling
1969-01-13 Well Mode changed to Drilled and Cased
1969-01-14 Production Casing Operation Performed
1969-01-15 Well Began Injection
1969-01-15 Well Fluid changed to Water
1969-01-15 Well Type changed to Injection
1969-02-11 Perforation Treatment Performed - Jet Perforation
1969-02-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-02-14 Perforation Treatment Performed - Fractured
1969-06-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1969-06-03 Perforation Treatment Performed - Jet Perforation
2006-09-10 Well Log Performed
2006-09-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-09-11 Perforation Treatment Performed - Jet Perforation
2006-09-11 Plug Back Performed
2006-09-11 Well Fluid changed to Water
2006-09-11 Well Log Performed
2006-09-11 Well Mode changed to Abandoned Zone
2006-09-11 Well Type changed to Injection
2006-09-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-09-12 Perforation Treatment Performed - Remedial Casing
2006-09-14 Perforation Treatment Performed - Jet Perforation
2006-09-14 Well Log Performed
2006-09-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-09-19 Perforation Treatment Performed - Remedial Casing
2006-09-25 Well Log Performed
2006-09-27 Perforation Treatment Performed - Jet Perforation
2006-09-27 Well Log Performed
2006-09-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-09-28 Perforation Treatment Performed - Remedial Casing
2006-09-29 Well Log Performed
2007-01-12 Well Abandoned
2007-01-12 Well Fluid changed to Water
2007-01-12 Well Mode changed to Abandoned
2007-01-12 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1969-02-11 Perforation 787.30 788.20 13
2006-09-14 Perforation 271.00 271.50 17
2006-09-19 Remedial Casing Cementing 271.00 271.50 0
2006-09-19 Packing Device Capped w/Cement 255.70 265.70 0
2006-09-27 Perforation 192.00 192.50 17
2006-09-28 Remedial Casing Cementing 192.00 192.50 0
2006-09-28 Packing Device Capped w/Cement 176.20 185.00 0
1969-02-12 Acid Treatment 787.30 788.20 0
1969-02-14 Fracture 787.30 788.20 0
1969-06-03 Packing Device Capped w/Cement 797.40 797.40 0
1969-06-03 Perforation 789.40 791.30 7
2006-09-11 Packing Device Capped w/Cement 765.00 775.00 0
2006-09-11 Perforation 293.00 293.50 17
2006-09-12 Remedial Casing Cementing 293.00 293.50 0
2006-09-12 Packing Device Capped w/Cement 278.50 288.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1969 0 0.0 0.0 0.0
1970 0 0.0 0.0 0.0
1971 0 0.0 0.0 0.0
1972 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1980 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0

For data sources see[5]

References