If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0414011604C20 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.524013,"lon":-110.099355,"icon":""}]} |
Location: C2/04-16-041-01W4/0 | |
Location Alias: C2/04-16-41-01 W4M | |
Location Alias 2: C2/04-16-041-01 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 041 | |
Meridian: 4 | |
Range: 01 | |
Section: 16 | |
County/Municipality: Municipal District of Wainwright No. 61 | |
Well Name: WLEC 1C2 HAYTER 4-16-41-1 | |
Operator Name: West Lake Energy Corp. | |
License Number: 0190233 | |
License Date: 1996-08-07 | |
License Status: Suspension | |
Spud Date: 1996-08-20 | |
Final Drill Date: 1996-08-25 | |
Well Total Depth: 892.00 m | |
Surface Hole Latitude: 52.524013 | |
Surface Hole Longitude: -110.099355 |
Date | Event |
---|---|
1996-08-07 | Obtained License |
1996-08-21 | Surface Casing Operation Performed |
1996-08-22 | Direction Drilling Operation Performed - Deviate |
1996-08-23 | Well Log Performed |
1996-08-24 | Well Log Performed |
1996-08-25 | Finished Drilling |
1996-08-25 | Well Mode changed to Drilled and Cased |
1996-08-26 | Production Casing Operation Performed |
1996-08-27 | Rig Released |
1997-01-13 | Well Log Performed |
1997-02-01 | Well Began Production |
1997-02-01 | Well Fluid changed to Crude Oil |
1997-02-01 | Well Mode changed to Pumping |
1997-02-15 | Well Log Performed |
1997-02-18 | Perforation Treatment Performed - Jet Perforation |
1997-02-18 | Well Log Performed |
2008-08-17 | Well Fluid changed to Crude Oil |
2008-08-17 | Well Mode changed to Suspended |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1996-08-22 | 472.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1997-02-18 | Perforation | 844.00 | 847.00 | 39 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1997 | 6364 | 0.0 | 0.0 | 0.0 |
1998 | 2840 | 0.0 | 0.0 | 0.0 |
1999 | 5712 | 0.0 | 0.0 | 0.0 |
2000 | 3923 | 0.0 | 0.0 | 0.0 |
2002 | 3644 | 0.0 | 0.0 | 0.0 |
2003 | 8712 | 0.0 | 0.0 | 0.0 |
2004 | 8065 | 0.0 | 0.0 | 0.0 |
2005 | 7814 | 0.0 | 0.0 | 0.0 |
2006 | 8547 | 0.0 | 0.0 | 0.0 |
2007 | 348 | 0.0 | 0.0 | 0.0 |
For data sources see[6]