X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0414011615B30

Well Details

Well ID: 0414011615B30
Loading map...
Location: B3/15-16-041-01W4/0
Location Alias: B3/15-16-41-01 W4M
Location Alias 2: B3/15-16-041-01 W4/00
Country: Canada
Province: Alberta
Township: 041
Meridian: 4
Range: 01
Section: 16
County/Municipality: Municipal District of Wainwright No. 61
Well Name: WLEC B3 HAYTER 15-16-41-1
Operator Name: West Lake Energy Corp.
License Number: 0164837
License Date: 1994-02-08
License Status: Suspension
Spud Date: 1994-03-12
Final Drill Date: 1994-03-17
Well Total Depth: 1044.50 m
Surface Hole Latitude: 52.529022
Surface Hole Longitude: -110.091470

For data sources see[1][2]

Well History

Date Event
1994-02-08 Obtained License
1994-03-12 Direction Drilling Operation Performed - Deviate
1994-03-13 Surface Casing Operation Performed
1994-03-17 Finished Drilling
1994-03-17 Production Casing Operation Performed
1994-03-17 Rig Released
1994-03-17 Well Mode changed to Drilled and Cased
1994-03-24 Well Log Performed
1994-05-31 Well Log Performed
1994-06-03 Perforation Treatment Performed - Slotted Liner or Casing
1994-10-06 Well Began Production
1994-10-06 Well Fluid changed to Crude Oil
1994-10-06 Well Mode changed to Pumping
1996-11-25 Perforation Treatment Performed - Cement Plug
1996-11-25 Plug Back Performed
1996-11-28 Perforation Treatment Performed - Cement Plug
1996-11-28 Plug Back Performed
1996-11-30 Perforation Treatment Performed - Cement Plug
1997-03-16 Perforation Treatment Performed - Open-Hole Completion
1997-03-18 Liner Casing Operation Performed
2006-07-01 Well Fluid changed to Crude Oil
2006-07-01 Well Mode changed to Suspended
2010-08-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1994-03-12 33.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-06-03 Slotted Liner 1020.00 1034.50 0
1996-11-25 Cement Plug 999.00 1034.50 0
1996-11-28 Cement Plug 1012.00 1033.00 0
1996-11-30 Cement Plug 930.00 1033.40 0
1997-03-16 Open Hole/Barefoot Completion 1020.00 1044.50 0
2010-08-30 Packing Device Capped w/Cement 996.50 1004.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1994 845 0.0 0.0 0.0
1995 2515 0.0 0.0 0.0
1997 5072 0.0 0.0 0.0
1998 8252 0.0 0.0 0.0
1999 8658 0.0 0.0 0.0
2000 3647 0.0 0.0 0.0

For data sources see[6]

References