X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0414012203C00

Well Details

Well ID: 0414012203C00
Loading map...
Location: C0/03-22-041-01W4/0
Location Alias: C0/03-22-41-01 W4M
Location Alias 2: C0/03-22-041-01 W4/00
Country: Canada
Province: Alberta
Township: 041
Meridian: 4
Range: 01
Section: 22
County/Municipality: Municipal District of Wainwright No. 61
Well Name: WLEC 1C0 HAYTER 3-22-41-1
Operator Name: West Lake Energy Corp.
License Number: 0140684
License Date: 1989-08-18
License Status: Suspension
Spud Date: 1989-08-21
Final Drill Date: 1989-08-25
Well Total Depth: 908.00 m
Surface Hole Latitude: 52.538101
Surface Hole Longitude: -110.070452

For data sources see[1][2]

Well History

Date Event
1989-08-18 Obtained License
1989-08-22 Surface Casing Operation Performed
1989-08-23 Direction Drilling Operation Performed - Deviate
1989-08-25 Finished Drilling
1989-08-25 Well Mode changed to Drilled and Cased
1989-08-26 Well Log Performed
1989-08-27 Production Casing Operation Performed
1989-08-27 Rig Released
1989-08-29 Well Log Performed
1989-08-30 Perforation Treatment Performed - Abrasa-Jet Perforation
1989-08-31 Perforation Treatment Performed - Abrasa-Jet Perforation
1989-09-16 Well Began Production
1989-09-16 Well Fluid changed to Crude Oil
1989-09-16 Well Mode changed to Pumping
1990-10-01 Well Fluid changed to Crude Oil
1990-10-01 Well Mode changed to Suspended
2006-06-16 Well Log Performed
2006-06-17 Perforation Treatment Performed - Jet Perforation
2006-06-17 Well Log Performed
2006-06-23 Perforation Treatment Performed - Cement Squeeze
2006-06-23 Plug Back Performed
2006-10-27 Well Fluid changed to Crude Oil
2006-10-27 Well Mode changed to Flowing
2014-12-01 Well Fluid changed to Crude Oil
2014-12-01 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1989-08-23 160.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1989-08-30 Hydra Jet Perforation 846.00 847.30 0
1989-08-31 Hydra Jet Perforation 848.00 850.00 0
2006-06-17 Perforation 691.00 696.00 17
2006-06-23 Cement Squeeze 691.00 696.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1989 2592 0.0 0.0 0.0
1990 5184 0.0 0.0 0.0
2006 1413 0.0 0.0 0.0
2007 7955 0.0 0.0 0.0
2008 8619 0.0 0.0 0.0
2009 7873 0.0 0.0 0.0
2010 8451 0.0 0.0 0.0
2011 8519 0.0 0.0 0.0
2012 7764 0.0 0.0 0.0
2013 7603 0.0 0.0 0.0
2014 1416 0.0 0.0 0.0

For data sources see[6]

References