If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0414022214020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.549691,"lon":-110.198233,"icon":""}]} |
Location: 02/14-22-041-02W4/0 | |
Location Alias: 02/14-22-41-02 W4M | |
Location Alias 2: 02/14-22-041-02 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 041 | |
Meridian: 4 | |
Range: 02 | |
Section: 22 | |
County/Municipality: Municipal District of Wainwright No. 61 | |
Well Name: ROCKEAST 102 HZ HAYTER 14-22-41-2 | |
Operator Name: Rockeast Energy Corp. | |
License Number: 0475453 | |
License Date: 2015-05-08 | |
License Status: Amended | |
Spud Date: 2015-06-15 | |
Final Drill Date: 2015-06-17 | |
Well Total Depth: 1376.00 m | |
Surface Hole Latitude: 52.549691 | |
Surface Hole Longitude: -110.198233 |
Date | Event |
---|---|
2015-05-08 | Obtained License |
2015-06-15 | Surface Casing Operation Performed |
2015-06-16 | Direction Drilling Operation Performed - Deviate |
2015-06-17 | Direction Drilling Operation Performed - Horizontal |
2015-06-17 | Finished Drilling |
2015-06-17 | Well Mode changed to Drilled and Cased |
2015-06-18 | Production Casing Operation Performed |
2015-06-18 | Rig Released |
2015-06-18 | Well Log Performed |
2015-06-28 | Liner Casing Operation Performed |
2015-06-28 | Perforation Treatment Performed - Slotted Liner or Casing |
2015-06-28 | Well Log Performed |
2015-07-17 | Well Began Production |
2015-07-17 | Well Fluid changed to Crude Oil |
2015-07-17 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2015-06-15 | Bonanza Drilling Inc. | 1 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2015-06-16 | 483.60 | Deviate (5 - 79 degrees) |
2015-06-17 | 840.30 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2015-06-28 | Slotted Liner | 854.00 | 1376.00 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2015 | 4008 | 0.0 | 0.0 | 0.0 |
2016 | 8165 | 0.0 | 0.0 | 0.0 |
2017 | 8646 | 0.0 | 0.0 | 0.0 |
2018 | 8320 | 0.0 | 0.0 | 0.0 |
2019 | 8687 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2015-06-18 | No Incident Encountered | 0.00 | 0.00 |
2015-06-28 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]