If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0414030309020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.50008,"lon":-110.343567,"icon":""}]} |
Location: 02/09-03-041-03W4/0 | |
Location Alias: 02/09-03-41-03 W4M | |
Location Alias 2: 02/09-03-041-03 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 041 | |
Meridian: 4 | |
Range: 03 | |
Section: 03 | |
County/Municipality: Municipal District of Provost No. 52 | |
Well Name: BOW RIVER PROVOST 9-3-41-3 | |
Operator Name: Bow River Energy Ltd. | |
License Number: 0181223 | |
License Date: 1995-10-05 | |
License Status: Issued | |
Spud Date: 1995-10-13 | |
Final Drill Date: 1995-10-15 | |
Well Total Depth: 821.00 m | |
Surface Hole Latitude: 52.500080 | |
Surface Hole Longitude: -110.343567 |
Date | Event |
---|---|
1995-10-05 | Obtained License |
1995-10-14 | Direction Drilling Operation Performed - Deviate |
1995-10-14 | Surface Casing Operation Performed |
1995-10-15 | Finished Drilling |
1995-10-15 | Well Mode changed to Drilled and Cased |
1995-10-16 | Production Casing Operation Performed |
1995-10-16 | Rig Released |
1995-10-16 | Well Log Performed |
1995-10-18 | Perforation Treatment Performed - Jet Perforation |
1995-10-20 | Well Began Production |
1995-10-20 | Well Fluid changed to Crude Oil |
1995-10-20 | Well Mode changed to Pumping |
1995-11-07 | Well Log Performed |
1998-09-17 | Well Log Performed |
1998-10-27 | Well Began Injection |
1998-10-27 | Well Fluid changed to Water |
1998-10-27 | Well Type changed to Disposal |
1998-10-28 | Well Fluid changed to Water |
1998-10-28 | Well Type changed to Injection |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1995-10-14 | 411.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1995-10-18 | Perforation | 777.50 | 780.00 | 13 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1995 | 1730 | 0.0 | 0.0 | 0.0 |
1996 | 8196 | 0.0 | 0.0 | 0.0 |
1997 | 8482 | 0.0 | 0.0 | 0.0 |
1998 | 5286 | 0.0 | 0.0 | 0.0 |
1999 | 0 | 0.0 | 0.0 | 0.0 |
2000 | 0 | 0.0 | 0.0 | 0.0 |
2001 | 0 | 0.0 | 0.0 | 0.0 |
2002 | 0 | 0.0 | 0.0 | 0.0 |
2003 | 0 | 0.0 | 0.0 | 0.0 |
2004 | 0 | 0.0 | 0.0 | 0.0 |
2005 | 0 | 0.0 | 0.0 | 0.0 |
2006 | 0 | 0.0 | 0.0 | 0.0 |
2007 | 0 | 0.0 | 0.0 | 0.0 |
2008 | 0 | 0.0 | 0.0 | 0.0 |
2009 | 0 | 0.0 | 0.0 | 0.0 |
2010 | 0 | 0.0 | 0.0 | 0.0 |
2011 | 0 | 0.0 | 0.0 | 0.0 |
2012 | 0 | 0.0 | 0.0 | 0.0 |
2013 | 0 | 0.0 | 0.0 | 0.0 |
2014 | 0 | 0.0 | 0.0 | 0.0 |
2015 | 0 | 0.0 | 0.0 | 0.0 |
2016 | 0 | 0.0 | 0.0 | 0.0 |
2017 | 0 | 0.0 | 0.0 | 0.0 |
2018 | 0 | 0.0 | 0.0 | 0.0 |
2019 | 0 | 0.0 | 0.0 | 0.0 |
2020 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[6]