X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0414031803050

Well Details

Well ID: 0414031803050
Loading map...
Location: 05/03-18-041-03W4/0
Location Alias: 05/03-18-41-03 W4M
Location Alias 2: 05/03-18-041-03 W4/00
Country: Canada
Province: Alberta
Township: 041
Meridian: 4
Range: 03
Section: 18
County/Municipality: Municipal District of Provost No. 52
Well Name: BOW RIVER PROVOST 3-18-41-3
Operator Name: Bow River Energy Ltd.
License Number: 0202684
License Date: 1997-06-19
License Status: Suspension
Spud Date: 1997-06-26
Final Drill Date: 1997-06-28
Well Total Depth: 819.00 m
Surface Hole Latitude: 52.522787
Surface Hole Longitude: -110.425955

For data sources see[1][2]

Well History

Date Event
1997-06-19 Obtained License
1997-06-27 Direction Drilling Operation Performed - Deviate
1997-06-27 Surface Casing Operation Performed
1997-06-28 Finished Drilling
1997-06-28 Well Log Performed
1997-06-28 Well Mode changed to Drilled and Cased
1997-06-29 Production Casing Operation Performed
1997-06-29 Rig Released
1997-07-07 Well Log Performed
1997-07-15 Perforation Treatment Performed - Jet Perforation
1997-07-15 Well Log Performed
1997-07-17 Well Began Production
1997-07-17 Well Fluid changed to Crude Oil
1997-07-17 Well Mode changed to Pumping
1997-09-01 Perforation Treatment Performed - Jet Perforation
1997-09-01 Well Log Performed
1997-09-03 Well Log Performed
1997-10-01 Well Fluid changed to Crude Oil
1997-10-01 Well Mode changed to Suspended
1997-10-03 Well Began Injection
1997-10-03 Well Fluid changed to Water
1997-10-03 Well Type changed to Injection
2009-07-21 Well Log Performed
2018-10-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-10-13 Plug Back Performed
2018-10-13 Well Fluid changed to Water
2018-10-13 Well Mode changed to Abandoned Zone
2018-10-13 Well Type changed to Injection

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1997-06-27 396.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-07-15 Perforation 796.00 796.50 14
1997-09-01 Perforation 798.00 806.00 14
2018-10-13 Packing Device Capped w/Cement 777.70 785.70 0
2018-10-13 Packing Device Capped w/Cement 694.70 702.70 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1997 1080 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-10-14 No Incident Encountered 0.00 0.00

For data sources see[7]

References