X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0414081210000

Well Details

Well ID: 0414081210000
Loading map...
Location: 00/10-12-041-08W4/0
Location Alias: 00/10-12-41-08 W4M
Location Alias 2: 00/10-12-041-08 W4/00
Country: Canada
Province: Alberta
Township: 041
Meridian: 4
Range: 08
Section: 12
County/Municipality: Municipal District of Provost No. 52
Well Name: PIONEER CANADA PROVOST 10-12-41-8
Operator Name: Sekur Energy Management Corp.
License Number: 0055835
License Date: 1975-11-18
License Status: Abandoned
Spud Date: 1975-11-24
Final Drill Date: 1975-11-28
Well Total Depth: 899.20 m
Surface Hole Latitude: 52.516701
Surface Hole Longitude: -111.019865

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1975-11-18 Obtained License
1975-11-28 Finished Drilling
1975-11-29 Production Casing Operation Performed
1976-09-01 Perforation Treatment Performed - Jet Perforation
1976-09-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-10-03 Well Mode changed to Drilled and Cased
1977-12-20 Well Began Production
1977-12-20 Well Fluid changed to Gas
1977-12-20 Well Mode changed to Flowing
1996-07-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-07-25 Plug Back Performed
1996-07-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-07-27 Perforation Treatment Performed - Jet Perforation
1996-07-27 Perforation Treatment Performed - Remedial Casing
1996-07-27 Well Abandoned
1996-07-27 Well Fluid changed to Gas
1996-07-27 Well Log Performed
1996-07-27 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-09-01 Perforation 708.10 709.30 13
1976-09-02 Acid Treatment 708.10 709.30 0
1996-07-25 Packing Device Capped w/Cement 691.00 699.00 0
1996-07-27 Perforation 195.40 195.90 13
1996-07-27 Remedial Casing Cementing 195.40 195.90 0
1996-07-27 Packing Device Capped w/Cement 176.00 210.40 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1977 264 0.0 0.0 0.0
1978 6201 0.0 0.0 0.0
1979 5788 0.0 0.0 0.0
1980 8172 0.0 0.0 0.0
1981 4576 0.0 0.0 0.0
1982 3349 0.0 0.0 0.0
1983 2177 0.0 0.0 0.0
1984 2603 0.0 0.0 0.0
1985 2718 0.0 0.0 0.0
1986 4178 0.0 0.0 0.0
1987 1659 0.0 0.0 0.0
1988 3722 0.0 0.0 0.0
1989 3111 0.0 0.0 0.0

For data sources see[5]

References