X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0414091413000

Well Details

Well ID: 0414091413000
Loading map...
Location: 00/13-14-041-09W4/0
Location Alias: 00/13-14-41-09 W4M
Location Alias 2: 00/13-14-041-09 W4/00
Country: Canada
Province: Alberta
Township: 041
Meridian: 4
Range: 09
Section: 14
County/Municipality: Municipal District of Provost No. 52
Well Name: PDVL PROVO 13-14-41-9
Operator Name: Primrose Drilling Ventures Ltd.
License Number: 0342011
License Date: 2005-11-04
License Status: Suspension
Spud Date: 2005-12-15
Final Drill Date: 2005-12-21
Well Total Depth: 905.00 m
Surface Hole Latitude: 52.532996
Surface Hole Longitude: -111.199560

For data sources see[1][2]

Well History

Date Event
2005-11-04 Obtained License
2005-12-16 Surface Casing Operation Performed
2005-12-21 Finished Drilling
2005-12-21 Well Log Performed
2005-12-21 Well Mode changed to Drilled and Cased
2005-12-22 Production Casing Operation Performed
2005-12-22 Rig Released
2006-01-15 Well Log Performed
2007-03-10 Perforation Treatment Performed - Jet Perforation
2007-10-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-10-07 Perforation Treatment Performed - Jet Perforation
2007-10-07 Plug Back Performed
2007-10-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-10-13 Perforation Treatment Performed - Jet Perforation
2007-10-13 Plug Back Performed
2007-11-18 Perforation Treatment Performed - Jet Perforation
2007-11-28 Well Began Production
2007-11-28 Well Fluid changed to Gas
2007-11-28 Well Mode changed to Flowing
2016-03-01 Well Fluid changed to Gas
2016-03-01 Well Mode changed to Suspended
2016-08-01 Well Fluid changed to Gas
2016-08-01 Well Mode changed to Flowing
2018-06-01 Well Fluid changed to Gas
2018-06-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2007-03-10 Perforation 876.00 881.00 20
2007-10-07 Packing Device Capped w/Cement 867.00 875.00 0
2007-10-07 Perforation 867.00 869.00 17
2007-10-13 Packing Device Capped w/Cement 857.00 865.00 0
2007-10-13 Perforation 746.50 747.50 17
2007-11-18 Perforation 812.00 814.00 13
2007-11-18 Perforation 795.50 801.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2007 745 0.0 0.0 0.0
2008 8524 0.0 0.0 0.0
2009 8203 0.0 0.0 0.0
2010 7985 0.0 0.0 0.0
2011 8663 0.0 0.0 0.0
2012 6743 0.0 0.0 0.0
2013 6800 0.0 0.0 0.0
2014 8581 0.0 0.0 0.0
2015 8434 0.0 0.0 0.0
2016 5037 0.0 0.0 0.0
2017 8528 0.0 0.0 0.0
2018 3286 0.0 0.0 0.0

For data sources see[5]

References