X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0414123108000

Well Details

Well ID: 0414123108000
Loading map...
Location: 00/08-31-041-12W4/0
Location Alias: 00/08-31-41-12 W4M
Location Alias 2: 00/08-31-041-12 W4/00
Country: Canada
Province: Alberta
Township: 041
Meridian: 4
Range: 12
Section: 31
County/Municipality: Flagstaff County
Well Name: KELES ET AL BELL 8-31-41-12
Operator Name: Keles Production Company Ltd.
License Number: 0038873
License Date: 1970-09-25
License Status: RecCertified
Spud Date: 1970-09-28
Final Drill Date: 1970-10-02
Well Total Depth: 908.30 m
Surface Hole Latitude: 52.569900
Surface Hole Longitude: -111.711138

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1970-09-25 Obtained License
1970-10-02 Drill Stem Test Performed
1970-10-02 Finished Drilling
1970-10-02 Well Mode changed to Drilled and Cased
1970-10-04 Production Casing Operation Performed
1970-10-19 Perforation Treatment Performed - Open-Hole Completion
1970-11-03 Well Began Production
1970-11-03 Well Fluid changed to Crude Oil
1970-11-03 Well Mode changed to Pumping
1989-09-01 Well Fluid changed to Crude Oil
1989-09-01 Well Mode changed to Suspended
1990-02-20 Well Log Performed
1990-05-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-05-15 Plug Back Performed
1990-05-15 Well Abandoned
1990-05-15 Well Fluid changed to Crude Oil
1990-05-15 Well Mode changed to Abandoned
1990-05-21 Well Log Performed
1990-05-29 Perforation Treatment Performed - Jet Perforation
1990-05-29 Perforation Treatment Performed - Remedial Casing
1990-05-29 Well Log Performed
1992-06-24 Well Log Performed
1992-10-01 Perforation Treatment Performed - Jet Perforation
1992-10-28 Perforation Treatment Performed - Remedial Casing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1970-10-19 Open Hole/Barefoot Completion 906.80 908.30 0
1990-05-15 Packing Device Capped w/Cement 893.00 901.00 0
1990-05-29 Perforation 258.40 259.00 13
1990-05-29 Remedial Casing Cementing 258.40 259.00 0
1992-10-01 Perforation 186.00 186.30 13
1992-10-28 Remedial Casing Cementing 186.00 186.30 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1970 1356 0.0 0.0 0.0
1971 8413 0.0 0.0 0.0
1972 8572 0.0 0.0 0.0
1973 8471 0.0 0.0 0.0
1974 7920 0.0 0.0 0.0
1975 8079 0.0 0.0 0.0
1976 8643 0.0 0.0 0.0
1977 8530 0.0 0.0 0.0
1978 8227 0.0 0.0 0.0
1979 8654 0.0 0.0 0.0
1980 8468 0.0 0.0 0.0
1981 8159 0.0 0.0 0.0
1982 8498 0.0 0.0 0.0
1983 8316 0.0 0.0 0.0
1984 8170 0.0 0.0 0.0
1985 8605 0.0 0.0 0.0
1986 8576 0.0 0.0 0.0
1987 8692 0.0 0.0 0.0
1988 8428 0.0 0.0 0.0
1989 4090 0.0 0.0 0.0

For data sources see[5]

References