X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0414123108020

Well Details

Well ID: 0414123108020
Loading map...
Location: 02/08-31-041-12W4/0
Location Alias: 02/08-31-41-12 W4M
Location Alias 2: 02/08-31-041-12 W4/00
Country: Canada
Province: Alberta
Township: 041
Meridian: 4
Range: 12
Section: 31
County/Municipality: Flagstaff County
Well Name: KELES BELL 8C-31-41-12
Operator Name: Keles Production Company Ltd.
License Number: 0097554
License Date: 1982-09-24
License Status: RecCertified
Spud Date: 1982-10-03
Final Drill Date: 1982-10-07
Well Total Depth: 908.00 m
Surface Hole Latitude: 52.570446
Surface Hole Longitude: -111.713629

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1982-09-24 Obtained License
1982-10-07 Drill Stem Test Performed
1982-10-07 Finished Drilling
1982-10-07 Well Mode changed to Drilled and Cased
1982-10-09 Production Casing Operation Performed
1982-10-27 Perforation Treatment Performed - Open-Hole Completion
1982-11-30 Well Began Production
1982-11-30 Well Fluid changed to Crude Oil
1982-11-30 Well Mode changed to Pumping
1992-01-01 Well Fluid changed to Crude Oil
1992-01-01 Well Mode changed to Suspended
1992-06-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-06-23 Plug Back Performed
1992-06-23 Well Log Performed
1992-07-21 Perforation Treatment Performed - Jet Perforation
1992-07-27 Perforation Treatment Performed - Remedial Casing
1992-07-27 Well Fluid changed to Crude Oil
1992-07-27 Well Mode changed to Abandoned Zone
1996-07-31 Well Abandoned
1996-07-31 Well Fluid changed to Crude Oil
1996-07-31 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1982-10-27 Open Hole/Barefoot Completion 902.60 908.00 0
1992-06-23 Packing Device Capped w/Cement 887.00 895.00 0
1992-07-21 Perforation 253.00 254.00 13
1992-07-27 Remedial Casing Cementing 253.00 254.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1982 720 0.0 0.0 0.0
1983 7420 0.0 0.0 0.0
1984 7931 0.0 0.0 0.0
1985 8048 0.0 0.0 0.0
1986 8287 0.0 0.0 0.0
1987 7985 0.0 0.0 0.0
1988 7671 0.0 0.0 0.0
1989 8406 0.0 0.0 0.0
1990 8677 0.0 0.0 0.0
1991 7520 0.0 0.0 0.0

For data sources see[5]

References