X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0414123108040

Well Details

Well ID: 0414123108040
Loading map...
Location: 04/08-31-041-12W4/0
Location Alias: 04/08-31-41-12 W4M
Location Alias 2: 04/08-31-041-12 W4/00
Country: Canada
Province: Alberta
Township: 041
Meridian: 4
Range: 12
Section: 31
County/Municipality: Flagstaff County
Well Name: KELES ET AL BELL 8A-31-41-12
Operator Name: Keles Production Company Ltd.
License Number: 0110314
License Date: 1984-10-29
License Status: RecCertified
Spud Date: 1984-11-06
Final Drill Date: 1984-11-11
Well Total Depth: 940.00 m
Surface Hole Latitude: 52.568879
Surface Hole Longitude: -111.711049

For data sources see[1][2]

Well History

Date Event
1984-10-29 Obtained License
1984-11-06 Surface Casing Operation Performed
1984-11-08 Direction Drilling Operation Performed - Deviate
1984-11-11 Finished Drilling
1984-11-11 Well Mode changed to Drilled and Cased
1984-11-12 Production Casing Operation Performed
1984-11-12 Well Log Performed
1984-11-13 Rig Released
1984-11-13 Well Log Performed
1984-11-26 Perforation Treatment Performed - Open-Hole Completion
1984-11-27 Perforation Treatment Performed - Cement Plug
1984-11-27 Well Log Performed
1984-11-29 Perforation Treatment Performed - Jet Perforation
1984-11-29 Well Log Performed
1984-12-18 Well Began Production
1984-12-18 Well Fluid changed to Crude Oil
1984-12-18 Well Mode changed to Pumping
1992-03-01 Well Fluid changed to Crude Oil
1992-03-01 Well Mode changed to Suspended
1992-06-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1992-06-23 Plug Back Performed
1992-06-23 Well Log Performed
1992-10-24 Perforation Treatment Performed - Jet Perforation
1992-10-24 Well Log Performed
1992-10-25 Perforation Treatment Performed - Remedial Casing
1992-10-25 Well Abandoned
1992-10-25 Well Fluid changed to Crude Oil
1992-10-25 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1984-11-08 329.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1984-11-26 Open Hole/Barefoot Completion 918.00 940.00 0
1984-11-27 Cement Plug 900.00 940.00 0
1984-11-29 Perforation 918.00 919.50 13
1992-06-23 Packing Device Capped w/Cement 902.00 910.00 0
1992-10-24 Perforation 255.00 256.00 7
1992-10-25 Remedial Casing Cementing 255.00 256.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1984 292 0.0 0.0 0.0
1985 8278 0.0 0.0 0.0
1986 8554 0.0 0.0 0.0
1987 8614 0.0 0.0 0.0
1988 8674 0.0 0.0 0.0
1989 8535 0.0 0.0 0.0
1990 8498 0.0 0.0 0.0
1991 8413 0.0 0.0 0.0
1992 1152 0.0 0.0 0.0

For data sources see[6]

References