X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0414132804002

Well Details

Well ID: 0414132804002
Loading map...
Location: 00/04-28-041-13W4/2
Location Alias: 00/04-28-41-13 W4M
Location Alias 2: 00/04-28-041-13 W4/02
Country: Canada
Province: Alberta
Township: 041
Meridian: 4
Range: 13
Section: 28
County/Municipality: Flagstaff County
Well Name: PCP PCR ET AL KILLAM 4-28-41-13
Operator Name: Ovintiv Canada ULC
License Number: 0019471
License Date: 1960-08-02
License Status: Abandoned
Spud Date: 1960-08-08
Final Drill Date: 1960-08-15
Well Total Depth: 1004.60 m
Surface Hole Latitude: 52.552363
Surface Hole Longitude: -111.825054

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1960-08-02 Obtained License
1960-08-13 Drill Stem Test Performed
1960-08-15 Finished Drilling
1960-08-15 Well Mode changed to Drilled and Cased
1960-08-16 Production Casing Operation Performed
1969-11-02 Perforation Treatment Performed - Jet Perforation
1993-12-15 Perforation Treatment Performed - Jet Perforation
1993-12-15 Well Mode changed to Drilled and Cased
1996-06-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-06-24 Plug Back Performed
1999-06-24 Perforation Treatment Performed - Jet Perforation
1999-06-24 Well Log Performed
1999-06-24 Well Mode changed to Abandoned Zone
1999-06-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-06-25 Perforation Treatment Performed - Jet Perforation
1999-06-25 Plug Back Performed
1999-06-25 Well Log Performed
1999-06-30 Well Abandoned
1999-06-30 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1969-11-02 Perforation 787.00 789.10 7
1993-12-15 Perforation 924.70 926.30 17
1996-06-24 Packing Device Capped w/Cement 915.00 923.00 0
1999-06-24 Perforation 868.40 871.70 20
1999-06-24 Perforation 870.00 871.00 3
1999-06-25 Perforation 862.20 864.40 20
1999-06-25 Packing Device Capped w/Cement 853.00 861.00 0
1999-06-25 Packing Device Capped w/Cement 777.00 785.00 0

For data sources see[4]



References