X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0414150213D00

Well Details

Well ID: 0414150213D00
Loading map...
Location: D0/13-02-041-15W4/0
Location Alias: D0/13-02-41-15 W4M
Location Alias 2: D0/13-02-041-15 W4/00
Country: Canada
Province: Alberta
Township: 041
Meridian: 4
Range: 15
Section: 02
County/Municipality: Flagstaff County
Well Name: SOC GALAHAD 13-2-41-15
Operator Name: AlphaBow Energy Ltd.
License Number: 0141643
License Date: 1989-11-06
License Status: Abandoned
Spud Date: 1989-11-10
Final Drill Date: 1989-11-14
Well Total Depth: 1107.00 m
Surface Hole Latitude: 52.504130
Surface Hole Longitude: -112.062926

For data sources see[1][2]

Well History

Date Event
1989-11-06 Obtained License
1989-11-11 Surface Casing Operation Performed
1989-11-12 Direction Drilling Operation Performed - Deviate
1989-11-14 Finished Drilling
1989-11-14 Well Mode changed to Drilled and Cased
1989-11-15 Well Log Performed
1989-11-16 Production Casing Operation Performed
1989-11-16 Rig Released
1989-11-19 Perforation Treatment Performed - Jet Perforation
1989-11-22 Well Began Production
1989-11-22 Well Fluid changed to Crude Oil
1989-11-22 Well Mode changed to Pumping
1989-11-24 Perforation Treatment Performed - Jet Perforation
1990-02-22 Well Log Performed
1992-06-01 Well Fluid changed to Crude Oil
1992-06-01 Well Mode changed to Suspended
1995-02-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-02-22 Perforation Treatment Performed - Jet Perforation
1995-02-22 Plug Back Performed
1995-02-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-02-23 Plug Back Performed
1995-02-23 Well Abandoned
1995-02-23 Well Fluid changed to Crude Oil
1995-02-23 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1989-11-12 265.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1989-11-19 Perforation 1058.50 1060.50 13
1989-11-24 Perforation 1060.50 1061.50 13
1995-02-22 Packing Device Capped w/Cement 1054.00 1057.00 0
1995-02-22 Perforation 1051.00 1053.00 13
1995-02-22 Packing Device Capped w/Cement 1042.00 1050.00 0
1995-02-22 Perforation 1037.50 1038.00 13
1995-02-23 Packing Device Capped w/Cement 1026.00 1034.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1989 857 0.0 0.0 0.0
1990 6037 0.0 0.0 0.0
1991 8175 0.0 0.0 0.0
1992 3420 0.0 0.0 0.0

For data sources see[6]

References