X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0414151816000

Well Details

Well ID: 0414151816000
Loading map...
Location: 00/16-18-041-15W4/0
Location Alias: 00/16-18-41-15 W4M
Location Alias 2: 00/16-18-041-15 W4/00
Country: Canada
Province: Alberta
Township: 041
Meridian: 4
Range: 15
Section: 18
County/Municipality: Flagstaff County
Well Name: SOC GALAHAD 16-18-41-15
Operator Name: AlphaBow Energy Ltd.
License Number: 0397202
License Date: 2008-06-04
License Status: Suspension
Spud Date: 2008-06-24
Final Drill Date: 2008-06-26
Well Total Depth: 1102.00 m
Surface Hole Latitude: 52.534271
Surface Hole Longitude: -112.142966

For data sources see[1][2]

Well History

Date Event
2008-06-04 Obtained License
2008-06-25 Surface Casing Operation Performed
2008-06-26 Finished Drilling
2008-06-26 Well Mode changed to Drilled and Cased
2008-06-27 Production Casing Operation Performed
2008-06-27 Well Log Performed
2008-06-28 Perforation Treatment Performed - Open-Hole Completion
2008-06-28 Rig Released
2008-07-14 Perforation Treatment Performed - Jet Perforation
2009-09-16 Well Began Production
2009-09-16 Well Fluid changed to Gas
2009-09-16 Well Mode changed to Flowing
2010-01-08 Well Log Performed
2010-01-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-01-09 Perforation Treatment Performed - Jet Perforation
2010-01-09 Plug Back Performed
2010-01-09 Well Fluid changed to Gas
2010-01-09 Well Mode changed to Abandoned Zone
2012-11-15 Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem
2012-11-15 Plug Back Performed
2012-11-17 Perforation Treatment Performed - Jet Perforation
2012-11-17 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2008-06-28 Open Hole/Barefoot Completion 1099.00 1102.00 0
2008-07-14 Perforation 1073.00 1074.00 17
2010-01-09 Packing Device Capped w/Cement 1062.00 1070.00 0
2010-01-09 Perforation 1039.00 1040.00 17
2012-11-15 Packing Dev Cpd w/Res-Gyp Cem 1035.50 1038.50 0
2012-11-17 Perforation 1018.00 1020.00 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2009 135 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-12-04 No Incident Encountered 0.00 0.00

For data sources see[6]

References