X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0414153310022

Well Details

Well ID: 0414153310022
Loading map...
Location: 02/10-33-041-15W4/2
Location Alias: 02/10-33-41-15 W4M
Location Alias 2: 02/10-33-041-15 W4/02
Country: Canada
Province: Alberta
Township: 041
Meridian: 4
Range: 15
Section: 33
County/Municipality: Flagstaff County
Well Name: RENAISSANCE 10B GALAHAD 10-33-41-15
Operator Name: Husky Oil Operations Limited
License Number: 0167611
License Date: 1994-06-02
License Status: RecCertified
Spud Date: 1994-06-21
Final Drill Date: 1994-06-25
Well Total Depth: 1158.00 m
Surface Hole Latitude: 52.575514
Surface Hole Longitude: -112.099963

For data sources see[1][2]

Well History

Date Event
1994-06-02 Obtained License
1994-06-21 Surface Casing Operation Performed
1994-06-22 Direction Drilling Operation Performed - Deviate
1994-06-25 Finished Drilling
1994-06-25 Well Log Performed
1994-06-25 Well Mode changed to Drilled and Cased
1994-06-26 Production Casing Operation Performed
1994-06-26 Rig Released
1994-07-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-07-22 Perforation Treatment Performed - Jet Perforation
1994-07-22 Plug Back Performed
1994-08-16 Well Log Performed
1994-11-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-11-22 Perforation Treatment Performed - Jet Perforation
1994-11-22 Plug Back Performed
1994-11-23 Well Began Production
1994-11-23 Well Fluid changed to Gas
1994-11-23 Well Mode changed to Flowing
1995-08-01 Well Fluid changed to Gas
1995-08-01 Well Mode changed to Suspended
1995-10-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-10-14 Plug Back Performed
1995-10-14 Well Abandoned
1995-10-14 Well Fluid changed to Gas
1995-10-14 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1994-06-22 209.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-07-22 Perforation 1091.00 1092.00 13
1994-07-22 Packing Device Capped w/Cement 1087.00 1089.00 0
1994-07-22 Perforation 1067.50 1068.50 13
1994-07-22 Perforation 1072.00 1073.00 13
1994-07-22 Perforation 1076.50 1077.50 13
1994-11-22 Packing Device Capped w/Cement 1063.50 1066.50 0
1994-11-22 Perforation 1059.00 1060.00 13
1994-11-22 Perforation 1061.00 1061.70 13
1995-10-14 Packing Device Capped w/Cement 1047.00 1055.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1994 331 0.0 0.0 0.0

For data sources see[6]

References