X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0414162215000

Well Details

Well ID: 0414162215000
Loading map...
Location: 00/15-22-041-16W4/0
Location Alias: 00/15-22-41-16 W4M
Location Alias 2: 00/15-22-041-16 W4/00
Country: Canada
Province: Alberta
Township: 041
Meridian: 4
Range: 16
Section: 22
County/Municipality: Flagstaff County
Well Name: ACL ET AL FORESTBURG 15-22-41-16
Operator Name: Karve Energy Inc.
License Number: 0124005
License Date: 1986-09-24
License Status: Abandoned
Spud Date: 1986-10-08
Final Drill Date: 1986-10-13
Well Total Depth: 1137.00 m
Surface Hole Latitude: 52.547553
Surface Hole Longitude: -112.219036

For data sources see[1][2]

Well History

Date Event
1986-09-24 Obtained License
1986-10-09 Surface Casing Operation Performed
1986-10-13 Finished Drilling
1986-10-13 Well Log Performed
1986-10-13 Well Mode changed to Drilled and Cased
1986-10-14 Drill Stem Test Performed
1986-10-14 Production Casing Operation Performed
1986-10-15 Rig Released
1986-11-06 Perforation Treatment Performed - Jet Perforation
1986-11-06 Well Log Performed
1986-12-15 Well Began Production
1986-12-15 Well Fluid changed to Gas
1986-12-15 Well Mode changed to Flowing
2000-05-29 Well Log Performed
2001-02-27 Perforation Treatment Performed - Jet Perforation
2001-02-27 Well Log Performed
2008-05-31 Well Fluid changed to Gas
2008-05-31 Well Mode changed to Suspended
2010-03-22 Well Log Performed
2010-03-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-03-23 Plug Back Performed
2010-03-23 Well Fluid changed to Gas
2010-03-23 Well Mode changed to Abandoned Zone
2010-03-24 Perforation Treatment Performed - Jet Perforation
2010-03-24 Well Log Performed
2010-03-25 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-03-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-03-25 Perforation Treatment Performed - Jet Perforation
2010-03-25 Well Log Performed
2010-03-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-03-26 Perforation Treatment Performed - Remedial Casing
2010-03-27 Well Log Performed
2010-03-31 Well Abandoned
2010-03-31 Well Fluid changed to Gas
2010-03-31 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1986-11-06 Perforation 1049.00 1051.40 13
2001-02-27 Perforation 1053.00 1054.50 20
2010-03-23 Packing Device Capped w/Cement 1037.00 1045.00 0
2010-03-24 Perforation 577.00 578.00 17
2010-03-25 Packing Device Capped w/Cement 557.00 565.00 0
2010-03-25 Perforation 419.00 420.00 17
2010-03-25 Acid Treatment 419.00 420.00 0
2010-03-26 Remedial Casing Cementing 419.00 420.00 0
2010-03-26 Packing Device Capped w/Cement 395.00 417.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1986 398 0.0 0.0 0.0
1987 8250 0.0 0.0 0.0
1988 6598 0.0 0.0 0.0
1989 8151 0.0 0.0 0.0
1990 8509 0.0 0.0 0.0
1991 8688 0.0 0.0 0.0
1992 8623 0.0 0.0 0.0
1993 8576 0.0 0.0 0.0
1994 8557 0.0 0.0 0.0
1995 8558 0.0 0.0 0.0
1996 8592 0.0 0.0 0.0
1997 8300 0.0 0.0 0.0
1998 8448 0.0 0.0 0.0
1999 8463 0.0 0.0 0.0
2000 8393 0.0 0.0 0.0
2001 7681 0.0 0.0 0.0
2002 8487 0.0 0.0 0.0
2003 1579 0.0 0.0 0.0

For data sources see[5]

References