X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0414163413000

Well Details

Well ID: 0414163413000
Loading map...
Location: 00/13-34-041-16W4/0
Location Alias: 00/13-34-41-16 W4M
Location Alias 2: 00/13-34-041-16 W4/00
Country: Canada
Province: Alberta
Township: 041
Meridian: 4
Range: 16
Section: 34
County/Municipality: Flagstaff County
Well Name: ACL ET AL FORESTBURG 13-34-41-16
Operator Name: Karve Energy Inc.
License Number: 0146331
License Date: 1990-11-15
License Status: RecCertified
Spud Date: 1990-11-23
Final Drill Date: 1990-11-28
Well Total Depth: 1129.00 m
Surface Hole Latitude: 52.575948
Surface Hole Longitude: -112.231319

For data sources see[1][2]

Well History

Date Event
1990-11-15 Obtained License
1990-11-24 Surface Casing Operation Performed
1990-11-28 Drill Stem Test Performed
1990-11-28 Finished Drilling
1990-11-28 Well Log Performed
1990-11-28 Well Mode changed to Drilled and Cased
1990-11-29 Production Casing Operation Performed
1990-11-30 Rig Released
1990-12-12 Perforation Treatment Performed - Jet Perforation
1990-12-12 Well Log Performed
1991-01-15 Well Began Production
1991-01-15 Well Fluid changed to Gas
1991-01-15 Well Mode changed to Flowing
1995-11-30 Well Fluid changed to Gas
1995-11-30 Well Mode changed to Suspended
1998-04-08 Well Fluid changed to Gas
1998-04-08 Well Mode changed to Flowing
1999-10-08 Well Fluid changed to Gas
1999-10-08 Well Mode changed to Suspended
2000-08-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-08-22 Plug Back Performed
2000-08-23 Perforation Treatment Performed - Cement Plug
2000-08-23 Perforation Treatment Performed - Jet Perforation
2000-08-23 Perforation Treatment Performed - Remedial Casing
2000-08-24 Well Abandoned
2000-08-24 Well Fluid changed to Gas
2000-08-24 Well Mode changed to Abandoned
2000-09-23 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1990-12-12 Perforation 1044.00 1046.00 14
2000-08-22 Packing Device Capped w/Cement 1021.40 1033.20 0
2000-08-23 Perforation 259.00 260.00 10
2000-08-23 Remedial Casing Cementing 259.00 260.00 0
2000-08-23 Cement Plug 201.00 275.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1991 8357 0.0 0.0 0.0
1992 8583 0.0 0.0 0.0
1993 8456 0.0 0.0 0.0
1994 8441 0.0 0.0 0.0
1995 7559 0.0 0.0 0.0
1998 4817 0.0 0.0 0.0
1999 5538 0.0 0.0 0.0

For data sources see[5]

References