X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0414170611002

Well Details

Well ID: 0414170611002
Loading map...
Location: 00/11-06-041-17W4/2
Location Alias: 00/11-06-41-17 W4M
Location Alias 2: 00/11-06-041-17 W4/02
Country: Canada
Province: Alberta
Township: 041
Meridian: 4
Range: 17
Section: 06
County/Municipality: County of Stettler No. 6
Well Name: SIGNALTA RED WILLOW 11-6-41-17
Operator Name: Signalta Resources Limited
License Number: 0134825
License Date: 1988-07-08
License Status: RecCertified
Spud Date: 1988-07-11
Final Drill Date: 1988-07-18
Well Total Depth: 1241.00 m
Surface Hole Latitude: 52.499658
Surface Hole Longitude: -112.441521

For data sources see[1][2]

Well History

Date Event
1988-07-08 Obtained License
1988-07-12 Water Flow Occurred
1988-07-14 Surface Casing Operation Performed
1988-07-16 Drill Stem Test Performed
1988-07-18 Finished Drilling
1988-07-18 Well Log Performed
1988-07-18 Well Mode changed to Drilled and Cased
1988-07-19 Production Casing Operation Performed
1988-07-19 Rig Released
1988-07-19 Well Log Performed
1988-09-13 Well Log Performed
1988-09-14 Well Log Performed
1988-09-15 Perforation Treatment Performed - Jet Perforation
1988-09-15 Well Log Performed
1988-10-07 Well Log Performed
1988-10-09 Perforation Treatment Performed - Jet Perforation
1990-09-26 Well Began Production
1990-09-26 Well Fluid changed to Gas
1990-09-26 Well Mode changed to Flowing
1992-11-01 Well Fluid changed to Gas
1992-11-01 Well Mode changed to Suspended
1994-06-25 Well Fluid changed to Gas
1994-06-25 Well Mode changed to Flowing
1997-11-30 Well Fluid changed to Gas
1997-11-30 Well Mode changed to Suspended
1998-05-26 Perforation Treatment Performed - Jet Perforation
1998-05-26 Well Log Performed
1998-05-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-05-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-05-28 Plug Back Performed
1998-05-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-05-29 Plug Back Performed
1998-09-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-09-08 Perforation Treatment Performed - Cement Plug
1998-09-08 Perforation Treatment Performed - Jet Perforation
1998-09-08 Perforation Treatment Performed - Remedial Casing
1998-09-08 Plug Back Performed
1998-09-08 Well Fluid changed to Gas
1998-09-08 Well Log Performed
1998-09-08 Well Mode changed to Abandoned Zone
1998-09-14 Well Abandoned
1998-09-14 Well Fluid changed to Gas
1998-09-14 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-09-15 Perforation 1184.00 1186.00 13
1998-09-08 Perforation 271.00 272.00 10
1998-09-08 Remedial Casing Cementing 271.00 272.00 0
1998-09-08 Perforation 245.00 246.00 10
1998-09-08 Remedial Casing Cementing 245.00 246.00 0
1998-09-08 Cement Plug 110.00 246.00 0
1988-09-15 Perforation 1011.00 1012.50 13
1988-10-09 Perforation 1011.00 1015.00 13
1998-05-26 Perforation 1167.00 1169.00 13
1998-05-28 Acid Treatment 1011.00 1015.00 0
1998-05-28 Packing Device Capped w/Cement 1170.00 1178.00 0
1998-05-29 Packing Device Capped w/Cement 1152.00 1160.00 0
1998-09-08 Packing Device Capped w/Cement 992.00 1000.00 0
1998-09-08 Perforation 287.00 288.00 10

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1990 119 0.0 0.0 0.0
1991 6249 0.0 0.0 0.0
1992 1411 0.0 0.0 0.0
1994 291 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1988-07-12 Water Flow 45.00 45.00

For data sources see[6]

References