X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0415022805002

Well Details

Well ID: 0415022805002
Loading map...
Location: 00/05-28-041-02W5/2
Location Alias: 00/05-28-41-02 W5M
Location Alias 2: 00/05-28-041-02 W5/02
Country: Canada
Province: Alberta
Township: 041
Meridian: 5
Range: 02
Section: 28
County/Municipality: Ponoka County
Well Name: JOURNEY GILBY 5-28-41-2
Operator Name: Journey Energy Inc.
License Number: 0309026
License Date: 2004-05-26
License Status: Issued
Spud Date: 2004-07-17
Final Drill Date: 2004-07-24
Well Total Depth: 2108.00 m
Surface Hole Latitude: 52.552872
Surface Hole Longitude: -114.235460

For data sources see[1][2]

Well History

Date Event
2004-05-26 Obtained License
2004-07-18 Surface Casing Operation Performed
2004-07-19 Direction Drilling Operation Performed - Deviate
2004-07-24 Finished Drilling
2004-07-24 Well Log Performed
2004-07-24 Well Mode changed to Drilled and Cased
2004-07-26 Production Casing Operation Performed
2004-07-26 Rig Released
2004-08-09 Well Log Performed
2004-08-15 Perforation Treatment Performed - Jet Perforation
2004-08-17 Perforation Treatment Performed - Fractured
2004-09-30 Well Log Performed
2004-10-01 Perforation Treatment Performed - Jet Perforation
2004-10-02 Perforation Treatment Performed - Fractured
2004-10-09 Perforation Treatment Performed - Cement Squeeze
2004-10-09 Plug Back Performed
2004-10-09 Well Mode changed to Abandoned Zone
2004-10-13 Well Log Performed
2004-10-14 Perforation Treatment Performed - Jet Perforation
2004-10-15 Perforation Treatment Performed - Fractured
2004-10-22 Perforation Treatment Performed - Cement Squeeze
2004-10-22 Plug Back Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2004-07-19 409.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2004-08-15 Perforation 2060.00 2064.00 17
2004-08-17 Fracture 2060.00 2064.00 0
2004-10-01 Perforation 1165.00 1169.00 17
2004-10-02 Fracture 1165.00 1169.00 0
2004-10-09 Cement Squeeze 1165.00 1169.00 0
2004-10-14 Perforation 552.00 555.00 17
2004-10-15 Fracture 552.00 555.00 0
2004-10-22 Cement Squeeze 552.00 555.00 0

For data sources see[5]



References