X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0415043301022

Well Details

Well ID: 0415043301022
Loading map...
Location: 02/01-33-041-04W5/2
Location Alias: 02/01-33-41-04 W5M
Location Alias 2: 02/01-33-041-04 W5/02
Country: Canada
Province: Alberta
Township: 041
Meridian: 5
Range: 04
Section: 33
County/Municipality: Ponoka County
Well Name: BEC HZ GILBY 1-33-41-4
Operator Name: Bonavista Energy Corporation
License Number: 0433123
License Date: 2011-04-22
License Status: Amended
Spud Date: 2011-04-23
Final Drill Date: 2011-05-09
Well Total Depth: 3510.00 m
Surface Hole Latitude: 52.582915
Surface Hole Longitude: -114.510543

For data sources see[1][2]

Well History

Date Event
2011-04-22 Obtained License
2011-04-23 Surface Casing Operation Performed
2011-05-02 Direction Drilling Operation Performed - Horizontal
2011-05-05 Intermediate Casing Operation Performed
2011-05-05 Well Log Performed
2011-05-09 Finished Drilling
2011-05-09 Well Log Performed
2011-05-09 Well Mode changed to Drilled and Cased
2011-05-11 Liner Casing Operation Performed
2011-05-11 Perforation Treatment Performed - Open-Hole Completion
2011-05-11 Perforation Treatment Performed - Slotted Liner or Casing
2011-05-11 Rig Released
2011-05-20 Perforation Treatment Performed - Multi-Stage Fracture
2011-05-24 Well Began Production
2011-05-24 Well Fluid changed to Gas
2011-05-24 Well Mode changed to Flowing
2013-07-01 Well Fluid changed to Gas
2013-07-01 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-05-02 1818.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-05-11 Open Hole/Barefoot Completion 2234.00 3510.00 0
2011-05-20 Multi-Stage Fracture 3153.30 3153.40 0
2011-05-20 Multi-Stage Fracture 3274.80 3274.90 0
2011-05-20 Multi-Stage Fracture 3396.30 3396.40 0
2011-05-20 Multi-Stage Fracture 3485.10 3486.10 0
2011-05-11 Slotted Liner 2234.00 3508.00 0
2011-05-20 Multi-Stage Fracture 2308.50 2308.60 0
2011-05-20 Multi-Stage Fracture 2434.00 2434.10 0
2011-05-20 Multi-Stage Fracture 2544.80 2544.90 0
2011-05-20 Multi-Stage Fracture 2669.20 2669.30 0
2011-05-20 Multi-Stage Fracture 2793.80 2793.90 0
2011-05-20 Multi-Stage Fracture 2905.20 2905.30 0
2011-05-20 Multi-Stage Fracture 3030.30 3030.40 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 5178 0.0 0.0 0.0
2012 8758 0.0 0.0 0.0
2013 8590 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8303 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

References