X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0415052011002

Well Details

Well ID: 0415052011002
Loading map...
Location: 00/11-20-041-05W5/2
Location Alias: 00/11-20-41-05 W5M
Location Alias 2: 00/11-20-041-05 W5/02
Country: Canada
Province: Alberta
Township: 041
Meridian: 5
Range: 05
Section: 20
County/Municipality: Clearwater County
Well Name: TANDEM WILLGR 11-20-41-5
Operator Name: Incipient Exploration Ltd.
License Number: 0411958
License Date: 2009-08-25
License Status: Issued
Spud Date: 2009-08-31
Final Drill Date: 2009-09-02
Well Total Depth: 1005.00 m
Surface Hole Latitude: 52.546697
Surface Hole Longitude: -114.690844

For data sources see[1][2]

Well History

Date Event
2009-08-25 Obtained License
2009-09-01 Surface Casing Operation Performed
2009-09-02 Finished Drilling
2009-09-02 Well Log Performed
2009-09-02 Well Mode changed to Drilled and Cased
2009-09-03 Production Casing Operation Performed
2009-09-03 Rig Released
2009-09-16 Well Log Performed
2009-10-05 Perforation Treatment Performed - Jet Perforation
2009-10-05 Well Log Performed
2009-10-06 Perforation Treatment Performed - Fractured
2009-10-13 Perforation Treatment Performed - Jet Perforation
2009-10-13 Well Log Performed
2009-10-14 Perforation Treatment Performed - Remedial Casing
2009-10-16 Well Log Performed
2009-10-25 Perforation Treatment Performed - Jet Perforation
2009-10-25 Well Log Performed
2009-10-27 Perforation Treatment Performed - Remedial Casing
2009-11-05 Well Log Performed
2009-12-23 Well Began Production
2009-12-23 Well Fluid changed to Gas
2009-12-23 Well Mode changed to Flowing
2011-01-01 Well Fluid changed to Gas
2011-01-01 Well Mode changed to Suspended
2011-04-01 Well Fluid changed to Gas
2011-04-01 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2009-10-05 Perforation 689.00 690.00 17
2009-10-06 Fracture 745.00 746.00 0
2009-10-13 Perforation 350.00 350.50 20
2009-10-14 Remedial Casing Cementing 350.00 350.50 0
2009-10-25 Perforation 241.00 242.00 17
2009-10-27 Remedial Casing Cementing 241.00 242.00 0
2009-10-05 Perforation 659.00 660.00 17
2009-10-05 Perforation 745.00 746.00 17
2009-10-05 Perforation 932.00 933.00 17
2009-10-05 Perforation 926.50 927.50 17
2009-10-06 Fracture 659.00 660.00 0
2009-10-06 Fracture 689.00 690.00 0
2009-10-06 Fracture 932.00 933.00 0
2009-10-06 Fracture 926.50 927.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2009 217 0.0 0.0 0.0
2010 7860 0.0 0.0 0.0
2011 6090 0.0 0.0 0.0
2012 7815 0.0 0.0 0.0
2013 6793 0.0 0.0 0.0
2014 3547 0.0 0.0 0.0
2015 8519 0.0 0.0 0.0
2016 8713 0.0 0.0 0.0
2017 8712 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References