X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0424091010000

Well Details

Well ID: 0424091010000
Loading map...
Location: 00/10-10-042-09W4/0
Location Alias: 00/10-10-42-09 W4M
Location Alias 2: 00/10-10-042-09 W4/00
Country: Canada
Province: Alberta
Township: 042
Meridian: 4
Range: 09
Section: 10
County/Municipality: Municipal District of Provost No. 52
Well Name: CLEO ENERGY PROVOST 10-10-42-9
Operator Name: Cleo Energy Corp.
License Number: 0098967
License Date: 1982-11-18
License Status: Issued
Spud Date: 1982-11-20
Final Drill Date: 1982-11-23
Well Total Depth: 884.00 m
Surface Hole Latitude: 52.604597
Surface Hole Longitude: -111.215841

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1982-11-18 Obtained License
1982-11-20 Lost Circulation Occurred
1982-11-22 Drill Stem Test Performed
1982-11-23 Finished Drilling
1982-11-24 Drill Stem Test Performed
1982-11-25 Production Casing Operation Performed
1982-11-25 Well Mode changed to Drilled and Cased
1983-02-17 Perforation Treatment Performed - Jet Perforation
1985-06-21 Well Began Production
1985-06-21 Well Fluid changed to Gas
1985-06-21 Well Mode changed to Flowing
1990-02-25 Perforation Treatment Performed - Jet Perforation
1990-02-25 Well Log Performed
1992-03-01 Well Fluid changed to Gas
1992-03-01 Well Mode changed to Suspended
1992-11-16 Well Fluid changed to Gas
1992-11-16 Well Mode changed to Flowing
1994-02-28 Well Fluid changed to Gas
1994-02-28 Well Mode changed to Suspended
1996-04-24 Well Fluid changed to Gas
1996-04-24 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1983-02-17 Perforation 698.00 699.70 7
1983-02-17 Perforation 694.70 696.70 7
1983-02-17 Perforation 685.20 686.70 7
1983-02-17 Perforation 679.50 681.00 7
1990-02-25 Perforation 679.50 681.00 13
1990-02-25 Perforation 685.20 686.70 13
1990-02-25 Perforation 694.70 696.70 13
1990-02-25 Perforation 698.00 699.70 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1985 3131 0.0 0.0 0.0
1986 4328 0.0 0.0 0.0
1987 1841 0.0 0.0 0.0
1988 3207 0.0 0.0 0.0
1989 5034 0.0 0.0 0.0
1990 5993 0.0 0.0 0.0
1991 6094 0.0 0.0 0.0
1992 2159 0.0 0.0 0.0
1993 7202 0.0 0.0 0.0
1994 597 0.0 0.0 0.0
1996 5033 0.0 0.0 0.0
1997 5577 0.0 0.0 0.0
1998 4200 0.0 0.0 0.0
1999 4650 0.0 0.0 0.0
2000 8094 0.0 0.0 0.0
2001 8758 0.0 0.0 0.0
2002 7552 0.0 0.0 0.0
2003 8281 0.0 0.0 0.0
2004 8124 0.0 0.0 0.0
2005 8140 0.0 0.0 0.0
2006 7379 0.0 0.0 0.0
2007 7880 0.0 0.0 0.0
2008 7542 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8456 0.0 0.0 0.0
2011 8458 0.0 0.0 0.0
2012 8686 0.0 0.0 0.0
2013 8652 0.0 0.0 0.0
2014 5427 0.0 0.0 0.0
2015 8695 0.0 0.0 0.0
2016 7997 0.0 0.0 0.0
2017 7824 0.0 0.0 0.0
2018 5765 0.0 0.0 0.0
2019 4702 0.0 0.0 0.0
2020 1545 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1982-11-20 Lost Circulation 50.00 50.00

For data sources see[6]

References