X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0424120416000

Well Details

Well ID: 0424120416000
Loading map...
Location: 00/16-04-042-12W4/0
Location Alias: 00/16-04-42-12 W4M
Location Alias 2: 00/16-04-042-12 W4/00
Country: Canada
Province: Alberta
Township: 042
Meridian: 4
Range: 12
Section: 04
County/Municipality: Flagstaff County
Well Name: CLEO ENERGY SEDGE 16-4-42-12
Operator Name: Cleo Energy Corp.
License Number: 0107836
License Date: 1984-06-22
License Status: Suspension
Spud Date: 1984-06-25
Final Drill Date: 1984-06-28
Well Total Depth: 974.00 m
Surface Hole Latitude: 52.591260
Surface Hole Longitude: -111.666032

For data sources see[1][2]

Well History

Date Event
1984-06-22 Obtained License
1984-06-26 Surface Casing Operation Performed
1984-06-28 Finished Drilling
1984-06-28 Well Mode changed to Drilled and Cased
1984-06-29 Drill Stem Test Performed
1984-06-29 Well Log Performed
1984-06-30 Drill Stem Test Performed
1984-07-01 Production Casing Operation Performed
1984-07-01 Rig Released
1984-07-05 Well Log Performed
1984-07-10 Well Log Performed
1984-07-11 Perforation Treatment Performed - Jet Perforation
1984-07-11 Well Began Production
1984-07-11 Well Fluid changed to Crude Oil
1984-07-11 Well Mode changed to Pumping
1992-09-13 Perforation Treatment Performed - Fractured
1992-10-19 Well Log Performed
1992-10-21 Perforation Treatment Performed - Jet Perforation
1992-10-21 Well Fluid changed to Crude Oil
1992-10-21 Well Mode changed to Pumping
1992-10-24 Perforation Treatment Performed - Fractured
2002-07-19 Perforation Treatment Performed - Cement Squeeze
2002-07-24 Perforation Treatment Performed - Jet Perforation
2002-07-24 Well Log Performed
2002-07-25 Perforation Treatment Performed - Jet Perforation
2002-07-26 Perforation Treatment Performed - Cement Squeeze
2002-07-28 Perforation Treatment Performed - Jet Perforation
2002-08-01 Perforation Treatment Performed - Cement Squeeze
2002-08-09 Perforation Treatment Performed - Jet Perforation
2002-08-09 Well Log Performed
2006-07-31 Well Fluid changed to Crude Oil
2006-07-31 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1984-07-11 Perforation 915.20 916.70 13
2002-08-01 Cement Squeeze 331.00 332.00 0
2002-08-09 Perforation 914.50 917.50 13
1992-09-13 Fracture 915.20 916.70 0
1992-10-21 Perforation 903.00 905.00 13
1992-10-24 Fracture 903.00 905.00 0
2002-07-19 Cement Squeeze 903.00 905.00 0
2002-07-24 Perforation 914.50 917.50 13
2002-07-25 Perforation 910.00 911.00 13
2002-07-26 Cement Squeeze 910.00 911.00 0
2002-07-28 Perforation 331.00 332.00 14

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1984 3939 0.0 0.0 0.0
1985 8500 0.0 0.0 0.0
1986 7720 0.0 0.0 0.0
1987 8480 0.0 0.0 0.0
1988 8534 0.0 0.0 0.0
1989 7961 0.0 0.0 0.0
1990 6149 0.0 0.0 0.0
1991 8482 0.0 0.0 0.0
1992 6906 0.0 0.0 0.0
1993 7435 0.0 0.0 0.0
1994 6690 0.0 0.0 0.0
1995 7850 0.0 0.0 0.0
1996 7571 0.0 0.0 0.0
1997 7887 0.0 0.0 0.0
1998 8705 0.0 0.0 0.0
1999 8445 0.0 0.0 0.0
2000 8555 0.0 0.0 0.0
2001 8651 0.0 0.0 0.0
2002 4188 0.0 0.0 0.0

For data sources see[5]

References