X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0424120907002

Well Details

Well ID: 0424120907002
Loading map...
Location: 00/07-09-042-12W4/2
Location Alias: 00/07-09-42-12 W4M
Location Alias 2: 00/07-09-042-12 W4/02
Country: Canada
Province: Alberta
Township: 042
Meridian: 4
Range: 12
Section: 09
County/Municipality: Flagstaff County
Well Name: CLEO ENERGY SEDGE 7-9-42-12
Operator Name: Cleo Energy Corp.
License Number: 0014844
License Date: 1958-02-21
License Status: Abandoned
Spud Date: 1958-03-13
Final Drill Date: 1958-03-19
Well Total Depth: 903.70 m
Surface Hole Latitude: 52.599567
Surface Hole Longitude: -111.669233

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1958-02-21 Obtained License
1958-03-18 Drill Stem Test Performed
1958-03-19 Finished Drilling
1958-03-19 Well Mode changed to Drilled and Cased
1958-03-20 Production Casing Operation Performed
1958-03-22 Drill Stem Test Performed
1958-03-22 Perforation Treatment Performed - Bullet Perforation
1968-11-02 Perforation Treatment Performed - Jet Perforation
1968-11-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-11-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1968-11-05 Perforation Treatment Performed - Jet Perforation
1987-12-03 Well Log Performed
1988-05-30 Perforation Treatment Performed - Jet Perforation
1988-05-30 Well Log Performed
1989-11-11 Well Log Performed
1989-12-10 Perforation Treatment Performed - Jet Perforation
1989-12-10 Well Log Performed
1989-12-11 Perforation Treatment Performed - Jet Perforation
1989-12-11 Well Log Performed
1989-12-12 Perforation Treatment Performed - Jet Perforation
1989-12-13 Perforation Treatment Performed - Remedial Casing
1989-12-16 Perforation Treatment Performed - Remedial Casing
1990-01-05 Perforation Treatment Performed - Casing Patch (Over Perfs)
1990-01-05 Well Log Performed
1990-01-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-05-30 Well Log Performed
1990-05-31 Perforation Treatment Performed - Cement Plug
1990-05-31 Perforation Treatment Performed - Cement Squeeze
1990-05-31 Plug Back Performed
1990-06-01 Perforation Treatment Performed - Jet Perforation
1990-06-01 Well Log Performed
1990-07-04 Perforation Treatment Performed - Fractured
1990-07-06 Well Log Performed
1990-07-12 Well Began Production
1990-07-12 Well Fluid changed to Gas
1990-07-12 Well Mode changed to Flowing
2013-03-01 Well Fluid changed to Gas
2013-03-01 Well Mode changed to Suspended
2013-06-18 Well Fluid changed to Gas
2013-06-18 Well Mode changed to Flowing
2015-04-22 Perforation Treatment Performed - Cement Plug
2015-04-22 Perforation Treatment Performed - Cement Squeeze
2015-04-22 Plug Back Performed
2015-04-22 Well Fluid changed to Gas
2015-04-22 Well Mode changed to Abandoned Zone
2015-04-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-04-23 Perforation Treatment Performed - Jet Perforation
2015-04-23 Well Log Performed
2015-04-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-04-24 Perforation Treatment Performed - Remedial Casing
2015-05-08 Well Abandoned
2015-05-08 Well Fluid changed to Gas
2015-05-08 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1958-03-22 Bullet Perforation 875.40 875.70 13
1989-12-10 Perforation 827.00 827.30 13
1989-12-10 Perforation 835.00 835.30 13
1989-12-11 Perforation 780.00 780.30 13
1989-12-12 Perforation 680.00 680.50 13
1989-12-13 Remedial Casing Cementing 780.00 835.30 0
1989-12-16 Remedial Casing Cementing 680.00 680.50 0
1990-01-05 Casing Patch 680.00 680.50 0
1990-01-06 Acid Treatment 866.00 882.00 0
1990-05-31 Cement Squeeze 866.00 888.80 0
1990-05-31 Cement Plug 772.00 858.00 0
1958-03-22 Bullet Perforation 879.00 882.10 13
1990-06-01 Perforation 727.50 731.50 13
1990-07-04 Fracture 727.50 731.50 0
2015-04-22 Cement Squeeze 727.50 731.50 0
2015-04-22 Cement Plug 637.20 732.00 0
2015-04-23 Perforation 455.00 457.00 13
2015-04-23 Packing Device Capped w/Cement 442.00 450.00 0
2015-04-23 Perforation 296.00 298.00 13
2015-04-24 Remedial Casing Cementing 296.00 298.00 0
2015-04-24 Packing Device Capped w/Cement 277.80 293.00 0
1968-11-02 Perforation 887.60 888.80 13
1968-11-03 Acid Treatment 887.60 888.80 0
1968-11-05 Perforation 886.70 887.30 7
1968-11-05 Acid Treatment 886.70 888.80 0
1988-05-30 Perforation 866.00 868.50 13
1988-05-30 Perforation 871.50 873.00 13
1988-05-30 Perforation 879.00 882.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1990 3453 0.0 0.0 0.0
1991 8266 0.0 0.0 0.0
1992 8571 0.0 0.0 0.0
1993 7116 0.0 0.0 0.0
1994 7658 0.0 0.0 0.0
1995 8305 0.0 0.0 0.0
1996 8760 0.0 0.0 0.0
1997 8080 0.0 0.0 0.0
1998 8688 0.0 0.0 0.0
1999 8726 0.0 0.0 0.0
2000 6254 0.0 0.0 0.0
2001 8345 0.0 0.0 0.0
2002 8629 0.0 0.0 0.0
2003 8011 0.0 0.0 0.0
2004 8771 0.0 0.0 0.0
2005 8685 0.0 0.0 0.0
2006 8400 0.0 0.0 0.0
2007 7208 0.0 0.0 0.0
2008 8504 0.0 0.0 0.0
2009 8620 0.0 0.0 0.0
2010 8233 0.0 0.0 0.0
2011 5756 0.0 0.0 0.0
2013 4464 0.0 0.0 0.0
2014 2159 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-05-08 No Incident Encountered 0.00 0.00

For data sources see[6]

References