X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0424140110000

Well Details

Well ID: 0424140110000
Loading map...
Location: 00/10-01-042-14W4/0
Location Alias: 00/10-01-42-14 W4M
Location Alias 2: 00/10-01-042-14 W4/00
Country: Canada
Province: Alberta
Township: 042
Meridian: 4
Range: 14
Section: 01
County/Municipality: Flagstaff County
Well Name: SOC KILLAM 10-1-42-14
Operator Name: AlphaBow Energy Ltd.
License Number: 0039416
License Date: 1970-12-18
License Status: Abandoned
Spud Date: 1970-12-20
Final Drill Date: 1970-12-29
Well Total Depth: 969.30 m
Surface Hole Latitude: 52.589274
Surface Hole Longitude: -111.882564

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1970-12-18 Obtained License
1970-12-29 Finished Drilling
1970-12-30 Drill Stem Test Performed
1970-12-31 Production Casing Operation Performed
1971-11-01 Well Mode changed to Drilled and Cased
1971-12-09 Perforation Treatment Performed - Jet Perforation
1976-05-11 Well Began Production
1976-05-11 Well Fluid changed to Gas
1976-05-11 Well Mode changed to Flowing
1985-01-30 Perforation Treatment Performed - Jet Perforation
1985-02-07 Perforation Treatment Performed - Jet Perforation
1985-02-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-02-13 Perforation Treatment Performed - Cement Squeeze
1985-02-15 Perforation Treatment Performed - Jet Perforation
1985-02-18 Perforation Treatment Performed - Jet Perforation
1985-07-01 Well Fluid changed to Gas
1985-07-01 Well Mode changed to Suspended
1988-10-02 Well Fluid changed to Gas
1988-10-02 Well Mode changed to Suspended
1989-08-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-08-05 Plug Back Performed
1989-08-05 Well Abandoned
1989-08-05 Well Fluid changed to Gas
1989-08-05 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1971-12-09 Perforation 936.30 937.60 13
1985-01-30 Perforation 940.50 941.50 13
1985-02-07 Perforation 936.40 937.60 13
1985-02-13 Acid Treatment 936.30 941.50 0
1985-02-13 Cement Squeeze 936.30 941.50 0
1985-02-15 Perforation 936.40 937.60 13
1985-02-18 Perforation 785.00 787.50 13
1989-08-05 Packing Device Capped w/Cement 772.00 780.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 1476 0.0 0.0 0.0
1977 5930 0.0 0.0 0.0
1978 5704 0.0 0.0 0.0
1979 8350 0.0 0.0 0.0
1980 7562 0.0 0.0 0.0
1981 706 0.0 0.0 0.0
1982 544 0.0 0.0 0.0
1984 704 0.0 0.0 0.0
1985 363 0.0 0.0 0.0

For data sources see[5]

References