X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0424141104000

Well Details

Well ID: 0424141104000
Loading map...
Location: 00/04-11-042-14W4/0
Location Alias: 00/04-11-42-14 W4M
Location Alias 2: 00/04-11-042-14 W4/00
Country: Canada
Province: Alberta
Township: 042
Meridian: 4
Range: 14
Section: 11
County/Municipality: Flagstaff County
Well Name: CRESCENT POINT KILLAM 4-11-42-14
Operator Name: Crescent Point Energy Corp.
License Number: 0091551
License Date: 1981-08-06
License Status: Abandoned
Spud Date: 1981-08-07
Final Drill Date: 1981-08-09
Well Total Depth: 1015.00 m
Surface Hole Latitude: 52.597626
Surface Hole Longitude: -111.918740

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1981-08-06 Obtained License
1981-08-09 Finished Drilling
1981-08-09 Well Mode changed to Drilled and Cased
1981-08-10 Drill Stem Test Performed
1981-08-11 Production Casing Operation Performed
1981-08-24 Perforation Treatment Performed - Jet Perforation
1982-03-01 Well Began Production
1982-03-01 Well Fluid changed to Gas
1982-03-01 Well Mode changed to Flowing
1987-05-01 Well Fluid changed to Gas
1987-05-01 Well Mode changed to Suspended
1987-07-15 Well Fluid changed to Gas
1987-07-15 Well Mode changed to Flowing
1989-03-01 Well Fluid changed to Gas
1989-03-01 Well Mode changed to Suspended
1989-08-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-08-03 Perforation Treatment Performed - Jet Perforation
1989-08-03 Plug Back Performed
1989-08-03 Well Fluid changed to Gas
1989-08-03 Well Mode changed to Abandoned
1989-08-04 Perforation Treatment Performed - Remedial Casing
1989-08-10 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1981-08-24 Perforation 949.00 951.00 7
1989-08-03 Packing Device Capped w/Cement 937.00 945.00 0
1989-08-03 Perforation 349.00 350.00 13
1989-08-04 Remedial Casing Cementing 349.00 350.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1982 3975 0.0 0.0 0.0
1983 6052 0.0 0.0 0.0
1984 772 0.0 0.0 0.0
1985 4521 0.0 0.0 0.0
1986 368 0.0 0.0 0.0
1987 3848 0.0 0.0 0.0
1988 2535 0.0 0.0 0.0

For data sources see[5]

References