X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0424161413003

Well Details

Well ID: 0424161413003
Loading map...
Location: 00/13-14-042-16W4/3
Location Alias: 00/13-14-42-16 W4M
Location Alias 2: 00/13-14-042-16 W4/03
Country: Canada
Province: Alberta
Township: 042
Meridian: 4
Range: 16
Section: 14
County/Municipality: Flagstaff County
Well Name: SIGNALTA ETAL FOREST 13-14-42-16
Operator Name: Signalta Resources Limited
License Number: 0076217
License Date: 1979-06-08
License Status: Abandoned
Spud Date: 1979-08-02
Final Drill Date: 1979-08-07
Well Total Depth: 1127.00 m
Surface Hole Latitude: 52.620334
Surface Hole Longitude: -112.207137

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-06-08 Obtained License
1979-08-02 Lost Circulation Occurred
1979-08-07 Finished Drilling
1979-08-07 Well Mode changed to Drilled and Cased
1979-08-08 Drill Stem Test Performed
1979-08-09 Drill Stem Test Performed
1979-08-10 Production Casing Operation Performed
1979-08-23 Well Log Performed
1979-08-26 Perforation Treatment Performed - Jet Perforation
1979-08-28 Perforation Treatment Performed - Jet Perforation
1979-10-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1979-10-08 Perforation Treatment Performed - Jet Perforation
1986-05-12 Well Log Performed
1986-05-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-05-14 Perforation Treatment Performed - Cement Squeeze
1986-05-20 Well Log Performed
1986-05-21 Perforation Treatment Performed - Jet Perforation
1986-05-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-09-25 Well Began Injection
1986-09-25 Well Fluid changed to Water
1986-09-25 Well Type changed to Disposal
1998-06-24 Well Log Performed
1998-06-25 Perforation Treatment Performed - Jet Perforation
1998-06-26 Perforation Treatment Performed - Acid Squeeze - Press Used
2001-07-05 Perforation Treatment Performed - Bridge Plug No Cement Required
2001-07-07 Perforation Treatment Performed - Bridge Plug No Cement Required
2001-07-07 Well Log Performed
2001-07-08 Perforation Treatment Performed - Jet Perforation
2001-07-09 Well Log Performed
2001-08-22 Well Log Performed
2005-06-03 Perforation Treatment Performed - Acid Squeeze - Press Used
2005-09-07 Perforation Treatment Performed - Jet Perforation
2005-09-08 Perforation Treatment Performed - Acid Squeeze - Press Used
2017-12-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-12-05 Plug Back Performed
2017-12-05 Well Fluid changed to Water
2017-12-05 Well Mode changed to Abandoned Zone
2017-12-05 Well Type changed to Disposal
2017-12-06 Perforation Treatment Performed - Jet Perforation
2017-12-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-12-07 Perforation Treatment Performed - Remedial Casing
2018-12-04 Well Abandoned
2018-12-04 Well Fluid changed to Water
2018-12-04 Well Mode changed to Abandoned
2018-12-04 Well Type changed to Disposal

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-08-26 Perforation 1052.00 1053.00 7
1986-05-23 Acid Treatment 1086.70 1089.70 0
1998-06-25 Perforation 1094.50 1096.00 13
1998-06-26 Acid Treatment 1094.50 1096.00 0
2001-07-05 Bridge Plug, No Cement 1085.00 1086.00 0
2001-07-07 Bridge Plug, No Cement 1082.00 1083.00 0
2001-07-08 Perforation 1079.00 1081.00 13
2005-06-03 Acid Treatment 1079.00 1081.00 0
2005-09-07 Perforation 1042.00 1045.00 13
2005-09-07 Perforation 1052.00 1055.00 13
2005-09-07 Perforation 1057.00 1060.00 13
1979-08-28 Perforation 1094.30 1096.00 8
2005-09-07 Perforation 1070.00 1071.50 13
2005-09-07 Perforation 1073.00 1078.50 13
2005-09-08 Acid Treatment 1042.00 1081.00 0
2017-12-05 Packing Device Capped w/Cement 835.00 1082.00 0
2017-12-06 Perforation 347.00 348.00 17
2017-12-07 Remedial Casing Cementing 347.00 348.00 0
2017-12-07 Packing Device Capped w/Cement 213.20 343.00 0
1979-10-07 Packing Device Capped w/Cement 1086.00 1090.00 0
1979-10-08 Perforation 1074.00 1074.50 14
1986-05-14 Acid Treatment 1074.00 1074.50 0
1986-05-14 Cement Squeeze 1074.00 1074.50 0
1986-05-14 Acid Treatment 1052.00 1053.00 0
1986-05-14 Cement Squeeze 1052.00 1053.00 0
1986-05-21 Perforation 1086.70 1089.70 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1979-08-02 Lost Circulation 75.00 75.00
2017-12-07 No Incident Encountered 0.00 0.00

For data sources see[6]

References