If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0424230510000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.587589,"lon":-113.275668,"icon":""}]} |
Location: 00/10-05-042-23W4/0 | |
Location Alias: 00/10-05-42-23 W4M | |
Location Alias 2: 00/10-05-042-23 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 042 | |
Meridian: 4 | |
Range: 23 | |
Section: 05 | |
County/Municipality: Ponoka County | |
Well Name: DEML BASHAW 10-5-42-23 | |
Operator Name: Direct Energy Marketing Limited | |
License Number: 0147459 | |
License Date: 1991-01-17 | |
License Status: RecCertified | |
Spud Date: 1991-01-26 | |
Final Drill Date: 1991-02-05 | |
Well Total Depth: 1840.00 m | |
Surface Hole Latitude: 52.587589 | |
Surface Hole Longitude: -113.275668 |
Date | Event |
---|---|
1991-01-17 | Obtained License |
1991-01-27 | Surface Casing Operation Performed |
1991-02-04 | Lost Circulation Occurred |
1991-02-05 | Finished Drilling |
1991-02-06 | Well Log Performed |
1991-02-07 | Drill Stem Test Performed |
1991-02-09 | Production Casing Operation Performed |
1991-02-09 | Rig Released |
1991-02-09 | Well Mode changed to Drilled and Cased |
1991-02-23 | Well Log Performed |
1991-03-11 | Well Log Performed |
1991-03-13 | Perforation Treatment Performed - Jet Perforation |
1991-03-13 | Well Began Production |
1991-03-13 | Well Fluid changed to Crude Oil |
1991-03-13 | Well Mode changed to Flowing |
1993-03-06 | Well Log Performed |
1994-10-12 | Well Fluid changed to Crude Oil |
1994-10-12 | Well Mode changed to Pumping |
1996-03-16 | Perforation Treatment Performed - Jet Perforation |
1996-03-16 | Well Log Performed |
1996-03-17 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1996-04-12 | Perforation Treatment Performed - Cement Squeeze |
1996-04-14 | Perforation Treatment Performed - Jet Perforation |
1996-04-15 | Well Log Performed |
1996-04-17 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2000-09-12 | Perforation Treatment Performed - Jet Perforation |
2000-09-14 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2002-03-01 | Well Fluid changed to Crude Oil |
2002-03-01 | Well Mode changed to Suspended |
2010-06-24 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2010-06-24 | Plug Back Performed |
2010-06-24 | Well Fluid changed to Crude Oil |
2010-06-24 | Well Log Performed |
2010-06-24 | Well Mode changed to Abandoned Zone |
2010-06-25 | Well Log Performed |
2010-07-13 | Well Abandoned |
2010-07-13 | Well Fluid changed to Crude Oil |
2010-07-13 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1991-03-13 | Perforation | 1760.50 | 1762.50 | 14 |
1996-03-16 | Perforation | 1754.00 | 1757.00 | 17 |
1996-03-17 | Acid Treatment | 1754.00 | 1757.00 | 0 |
1996-04-12 | Cement Squeeze | 1754.00 | 1757.00 | 0 |
1996-04-14 | Perforation | 1759.00 | 1761.50 | 13 |
1996-04-17 | Acid Treatment | 1759.00 | 1761.50 | 0 |
2000-09-12 | Perforation | 1754.00 | 1756.00 | 18 |
2000-09-14 | Acid Treatment | 1754.00 | 1756.00 | 0 |
2010-06-24 | Packing Device Capped w/Cement | 1739.00 | 1747.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1991 | 5887 | 0.0 | 0.0 | 0.0 |
1992 | 7389 | 0.0 | 0.0 | 0.0 |
1993 | 7814 | 0.0 | 0.0 | 0.0 |
1994 | 7288 | 0.0 | 0.0 | 0.0 |
1995 | 8052 | 0.0 | 0.0 | 0.0 |
1996 | 6298 | 0.0 | 0.0 | 0.0 |
1997 | 8115 | 0.0 | 0.0 | 0.0 |
1998 | 4281 | 0.0 | 0.0 | 0.0 |
2000 | 2460 | 0.0 | 0.0 | 0.0 |
2001 | 8351 | 0.0 | 0.0 | 0.0 |
2002 | 1416 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
1991-02-04 | Lost Circulation | 1764.00 | 1771.00 |
For data sources see[6]