X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0424231202000

Well Details

Well ID: 0424231202000
Loading map...
Location: 00/02-12-042-23W4/0
Location Alias: 00/02-12-42-23 W4M
Location Alias 2: 00/02-12-042-23 W4/00
Country: Canada
Province: Alberta
Township: 042
Meridian: 4
Range: 23
Section: 12
County/Municipality: Ponoka County
Well Name: SUPREME BASHAW 2-12-42-23
Operator Name: Supreme Energy Inc.
License Number: 0023701
License Date: 1963-01-25
License Status: Issued
Spud Date: 1963-01-27
Final Drill Date: 1963-02-14
Well Total Depth: 1754.70 m
Surface Hole Latitude: 52.595479
Surface Hole Longitude: -113.180788

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1963-01-25 Obtained License
1963-02-14 Finished Drilling
1963-02-14 Well Mode changed to Drilled and Cased
1963-02-15 Production Casing Operation Performed
1963-03-08 Perforation Treatment Performed - Abrasa-Jet Perforation
1963-03-08 Perforation Treatment Performed - Selective Jet Perforations
1963-03-15 Well Began Production
1963-03-15 Well Fluid changed to Crude Oil
1963-03-15 Well Mode changed to Flowing
1963-03-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-05-08 Well Fluid changed to Crude Oil
1963-05-08 Well Mode changed to Flowing
1963-10-19 Perforation Treatment Performed - Cement Squeeze
1963-10-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-10-22 Perforation Treatment Performed - Abrasa-Jet Perforation
1969-06-27 Well Fluid changed to Crude Oil
1969-06-27 Well Mode changed to Suspended
1969-11-01 Well Fluid changed to Crude Oil
1969-11-01 Well Mode changed to Flowing
1971-04-01 Well Fluid changed to Crude Oil
1971-04-01 Well Mode changed to Suspended
1975-10-01 Well Fluid changed to Crude Oil
1975-10-01 Well Mode changed to Flowing
1976-02-01 Well Fluid changed to Crude Oil
1976-02-01 Well Mode changed to Suspended
1978-07-27 Well Fluid changed to Crude Oil
1978-07-27 Well Mode changed to Flowing
1982-05-22 Perforation Treatment Performed - Cement Squeeze
1982-05-22 Well Fluid changed to Crude Oil
1982-05-22 Well Mode changed to Flowing
1993-12-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1993-12-11 Perforation Treatment Performed - Cement Squeeze
1993-12-15 Well Log Performed
1993-12-16 Perforation Treatment Performed - Jet Perforation
1993-12-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-12-15 Perforation Treatment Performed - Cement Squeeze
1995-12-17 Well Log Performed
1995-12-18 Perforation Treatment Performed - Jet Perforation
1995-12-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-12-20 Well Log Performed
1996-01-04 Well Fluid changed to Crude Oil
1996-01-04 Well Mode changed to Pumping
1999-12-13 Perforation Treatment Performed - Jet Perforation
1999-12-13 Well Log Performed
1999-12-14 Perforation Treatment Performed - Acid Wash - No Pressure
1999-12-15 Well Log Performed
1999-12-16 Perforation Treatment Performed - Cement Squeeze
1999-12-19 Perforation Treatment Performed - Jet Perforation
1999-12-19 Well Log Performed
2000-01-12 Perforation Treatment Performed - Acid Wash - No Pressure

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1963-03-08 Selective Jet Perforations 1698.00 1700.50 0
1993-12-11 Acid Treatment 1738.60 1738.60 0
1993-12-11 Cement Squeeze 1738.60 1738.60 0
1993-12-16 Perforation 1736.80 1737.40 17
1993-12-17 Acid Treatment 1736.80 1737.40 0
1995-12-15 Cement Squeeze 1736.80 1737.40 0
1995-12-18 Perforation 1735.30 1736.80 17
1995-12-19 Acid Treatment 1735.30 1736.80 0
1999-12-13 Perforation 1734.30 1735.30 14
1999-12-14 Acid Wash 1734.30 1735.30 0
1999-12-16 Cement Squeeze 1734.30 1736.80 0
1963-03-08 Selective Jet Perforations 1703.50 1704.10 0
1999-12-19 Perforation 1734.30 1734.80 8
2000-01-12 Acid Wash 1734.30 1734.80 0
1963-03-08 Selective Jet Perforations 1704.70 1704.70 0
1963-03-08 Hydra Jet Perforation 1738.60 1738.60 0
1963-03-23 Acid Treatment 1698.00 1704.70 0
1963-10-19 Cement Squeeze 1738.60 1738.60 0
1963-10-21 Acid Treatment 1698.00 1704.70 0
1963-10-22 Hydra Jet Perforation 1738.60 1738.60 0
1982-05-22 Cement Squeeze 1698.00 1704.70 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 260 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1969 983 0.0 0.0 0.0
1975 377 0.0 0.0 0.0
1978 237 0.0 0.0 0.0
1979 5575 0.0 0.0 0.0
1981 2264 0.0 0.0 0.0
1982 6686 0.0 0.0 0.0
1983 6160 0.0 0.0 0.0
1984 6041 0.0 0.0 0.0
1985 8385 0.0 0.0 0.0
1986 8301 0.0 0.0 0.0
1987 5681 0.0 0.0 0.0
1988 8673 0.0 0.0 0.0
1989 8408 0.0 0.0 0.0
1990 8378 0.0 0.0 0.0
1991 7968 0.0 0.0 0.0
1992 12 0.0 0.0 0.0
1993 190 0.0 0.0 0.0
1994 8121 0.0 0.0 0.0
1995 7568 0.0 0.0 0.0
1996 7941 0.0 0.0 0.0
1997 6800 0.0 0.0 0.0
1998 8407 0.0 0.0 0.0
1999 7259 0.0 0.0 0.0
2000 7293 0.0 0.0 0.0
2001 8424 0.0 0.0 0.0
2002 6794 0.0 0.0 0.0
2003 7799 0.0 0.0 0.0
2004 7739 0.0 0.0 0.0
2005 8103 0.0 0.0 0.0
2006 8663 0.0 0.0 0.0
2007 8675 0.0 0.0 0.0
2008 7814 0.0 0.0 0.0
2009 8708 0.0 0.0 0.0
2010 8643 0.0 0.0 0.0
2011 4944 0.0 0.0 0.0
2012 7595 0.0 0.0 0.0
2013 8725 0.0 0.0 0.0
2014 7983 0.0 0.0 0.0
2015 8121 0.0 0.0 0.0
2016 3466 0.0 0.0 0.0
2017 8030 0.0 0.0 0.0
2018 6110 0.0 0.0 0.0
2019 52 0.0 0.0 0.0

For data sources see[5]

References