If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0424231804000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.611467,"lon":-113.310948,"icon":""}]} |
Location: 00/04-18-042-23W4/0 | |
Location Alias: 00/04-18-42-23 W4M | |
Location Alias 2: 00/04-18-042-23 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 042 | |
Meridian: 4 | |
Range: 23 | |
Section: 18 | |
County/Municipality: Ponoka County | |
Well Name: EMBER BASHAW 4-18-42-23 | |
Operator Name: Ember Resources Inc. | |
License Number: 0340388 | |
License Date: 2005-10-18 | |
License Status: Issued | |
Spud Date: 2005-10-21 | |
Final Drill Date: 2005-10-26 | |
Well Total Depth: 507.00 m | |
Surface Hole Latitude: 52.611467 | |
Surface Hole Longitude: -113.310948 |
Date | Event |
---|---|
2005-10-18 | Obtained License |
2005-10-21 | Surface Casing Operation Performed |
2005-10-26 | Finished Drilling |
2005-10-26 | Production Casing Operation Performed |
2005-10-26 | Rig Released |
2005-10-26 | Well Mode changed to Drilled and Cased |
2005-11-05 | Well Log Performed |
2005-11-13 | Perforation Treatment Performed - Jet Perforation |
2005-11-13 | Well Log Performed |
2005-11-22 | Perforation Treatment Performed - Fractured |
2006-06-23 | Well Began Production |
2006-06-23 | Well Fluid changed to Coalbed Methane-Coals Only |
2006-06-23 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2005-11-13 | Perforation | 481.60 | 482.00 | 13 |
2005-11-13 | Perforation | 448.30 | 448.70 | 13 |
2005-11-13 | Perforation | 436.50 | 437.00 | 13 |
2005-11-13 | Perforation | 426.90 | 427.20 | 13 |
2005-11-13 | Perforation | 420.00 | 420.40 | 13 |
2005-11-13 | Perforation | 417.30 | 418.00 | 13 |
2005-11-13 | Perforation | 413.90 | 414.20 | 13 |
2005-11-13 | Perforation | 386.60 | 387.00 | 13 |
2005-11-13 | Perforation | 364.60 | 365.20 | 13 |
2005-11-13 | Perforation | 356.00 | 357.00 | 13 |
2005-11-13 | Perforation | 348.50 | 349.00 | 13 |
2005-11-13 | Perforation | 479.90 | 480.30 | 13 |
2005-11-13 | Perforation | 346.00 | 347.00 | 13 |
2005-11-13 | Perforation | 337.70 | 338.00 | 13 |
2005-11-13 | Perforation | 321.60 | 322.10 | 13 |
2005-11-13 | Perforation | 311.60 | 312.40 | 13 |
2005-11-13 | Perforation | 299.50 | 300.00 | 13 |
2005-11-13 | Perforation | 285.00 | 285.50 | 13 |
2005-11-13 | Perforation | 284.00 | 284.40 | 13 |
2005-11-13 | Perforation | 277.90 | 278.20 | 13 |
2005-11-13 | Perforation | 274.50 | 275.00 | 13 |
2005-11-13 | Perforation | 263.00 | 263.50 | 13 |
2005-11-13 | Perforation | 476.50 | 477.20 | 13 |
2005-11-13 | Perforation | 254.50 | 255.00 | 13 |
2005-11-13 | Perforation | 210.30 | 211.20 | 13 |
2005-11-22 | Fracture | 479.90 | 482.00 | 0 |
2005-11-22 | Fracture | 472.80 | 477.20 | 0 |
2005-11-22 | Fracture | 466.90 | 467.30 | 0 |
2005-11-22 | Fracture | 455.30 | 460.20 | 0 |
2005-11-22 | Fracture | 448.30 | 450.30 | 0 |
2005-11-22 | Fracture | 436.50 | 437.00 | 0 |
2005-11-22 | Fracture | 426.90 | 427.20 | 0 |
2005-11-22 | Fracture | 413.90 | 420.40 | 0 |
2005-11-13 | Perforation | 472.80 | 473.30 | 13 |
2005-11-22 | Fracture | 386.60 | 387.00 | 0 |
2005-11-22 | Fracture | 364.60 | 365.20 | 0 |
2005-11-22 | Fracture | 356.00 | 357.00 | 0 |
2005-11-22 | Fracture | 346.00 | 349.00 | 0 |
2005-11-22 | Fracture | 337.70 | 338.00 | 0 |
2005-11-22 | Fracture | 321.60 | 322.10 | 0 |
2005-11-22 | Fracture | 311.60 | 312.40 | 0 |
2005-11-22 | Fracture | 299.50 | 300.00 | 0 |
2005-11-22 | Fracture | 284.00 | 285.50 | 0 |
2005-11-22 | Fracture | 274.50 | 278.20 | 0 |
2005-11-13 | Perforation | 466.90 | 467.30 | 13 |
2005-11-22 | Fracture | 263.00 | 263.50 | 0 |
2005-11-22 | Fracture | 254.50 | 255.00 | 0 |
2005-11-22 | Fracture | 210.30 | 211.20 | 0 |
2005-11-13 | Perforation | 459.80 | 460.20 | 13 |
2005-11-13 | Perforation | 458.10 | 459.00 | 13 |
2005-11-13 | Perforation | 455.30 | 455.80 | 13 |
2005-11-13 | Perforation | 449.90 | 450.30 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2006 | 4310 | 0.0 | 0.0 | 0.0 |
2007 | 8733 | 0.0 | 0.0 | 0.0 |
2008 | 8084 | 0.0 | 0.0 | 0.0 |
2009 | 8262 | 0.0 | 0.0 | 0.0 |
2010 | 8548 | 0.0 | 0.0 | 0.0 |
2011 | 8584 | 0.0 | 0.0 | 0.0 |
2012 | 8701 | 0.0 | 0.0 | 0.0 |
2013 | 8752 | 0.0 | 0.0 | 0.0 |
2014 | 8670 | 0.0 | 0.0 | 0.0 |
2015 | 7786 | 0.0 | 0.0 | 0.0 |
2016 | 8721 | 0.0 | 0.0 | 0.0 |
2017 | 8730 | 0.0 | 0.0 | 0.0 |
2018 | 8696 | 0.0 | 0.0 | 0.0 |
2019 | 2879 | 0.0 | 0.0 | 0.0 |
2020 | 575 | 0.0 | 0.0 | 0.0 |
For data sources see[5]