X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0424240303002

Well Details

Well ID: 0424240303002
Loading map...
Location: 00/03-03-042-24W4/2
Location Alias: 00/03-03-42-24 W4M
Location Alias 2: 00/03-03-042-24 W4/02
Country: Canada
Province: Alberta
Township: 042
Meridian: 4
Range: 24
Section: 03
County/Municipality: Ponoka County
Well Name: GLENCOE CHIGWELL 3-3-42-24
Operator Name: Glencoe Resources Ltd.
License Number: 0085966
License Date: 1980-09-30
License Status: Suspension
Spud Date: 1980-12-05
Final Drill Date: 1980-12-21
Well Total Depth: 1868.50 m
Surface Hole Latitude: 52.582900
Surface Hole Longitude: -113.375579

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-09-30 Obtained License
1980-12-21 Finished Drilling
1980-12-22 Well Log Performed
1980-12-25 Drill Stem Test Performed
1980-12-27 Drill Stem Test Performed
1980-12-28 Drill Stem Test Performed
1980-12-29 Drill Stem Test Performed
1980-12-31 Production Casing Operation Performed
1981-02-21 Perforation Treatment Performed - Jet Perforation
1981-02-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-05-24 Perforation Treatment Performed - Cement Squeeze
1981-05-27 Perforation Treatment Performed - Jet Perforation
1981-05-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-06-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1982-06-23 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-06-23 Perforation Treatment Performed - Jet Perforation
1982-06-24 Perforation Treatment Performed - Cement Squeeze
1982-06-25 Perforation Treatment Performed - Jet Perforation
1982-06-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-07-07 Well Log Performed
1984-07-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1984-07-08 Plug Back Performed
1984-07-09 Perforation Treatment Performed - Jet Perforation
1984-07-31 Well Mode changed to Drilled and Cased
2007-12-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2007-12-18 Perforation Treatment Performed - Jet Perforation
2007-12-19 Perforation Treatment Performed - Remedial Casing
2008-07-08 Perforation Treatment Performed - Jet Perforation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1981-02-21 Perforation 1843.50 1845.10 13
1982-06-25 Perforation 1839.80 1840.80 13
1982-06-27 Acid Treatment 1839.80 1840.80 0
1984-07-08 Packing Device Capped w/Cement 1824.00 1837.00 0
1984-07-09 Perforation 1597.40 1598.50 13
1984-07-09 Perforation 1601.00 1602.00 13
2007-12-17 Packing Device Capped w/Cement 1582.00 1590.00 0
2007-12-18 Perforation 672.90 674.90 1
2007-12-19 Remedial Casing Cementing 672.90 674.90 0
2008-07-08 Perforation 1597.40 1598.50 13
2008-07-08 Perforation 1601.00 1602.00 13
1981-02-22 Acid Treatment 1843.50 1845.10 0
1981-05-24 Cement Squeeze 1843.50 1845.10 0
1981-05-27 Perforation 1843.40 1844.70 13
1981-05-28 Acid Treatment 1843.40 1844.70 0
1982-06-18 Packing Device Capped w/Cement 1843.40 1844.70 0
1982-06-23 Perforation 1844.50 1846.00 13
1982-06-23 Acid Treatment 1844.50 1846.00 0
1982-06-24 Cement Squeeze 1844.50 1846.00 0

For data sources see[4]



References